Revision history of "Ordering water and sewage management in the city and municipality of Wronki – Stage II" (Q85207)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 55,024 bytes +27 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 54,997 bytes +17 Set a claim value: summary (P836): O âmbito material do projeto inclui: 1) Modernização da estação de tratamento de águas residuais – extensão de 13 330 RLM para 26 884 RLM, 2) Modernização dos SUW – 1 unidade, 3) Construção de um sistema de esgotos sanitários – 1,7 km, 4) Modernização do sistema de esgotos sanitários – 3,0 km, 5) Construção de uma rede de abastecimento de água – 0,7 km, 6) Implementação de sistemas inteligentes de gestão da água e das águas residuais e SIG – unidade...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:4418:44, 2 March 2023DG Regio talk contribs 51,810 bytes −17 Changed label, description and/or aliases in lv, it, da, sk, fr, sl, hr, fi, sv, de, ga, ro, bg, pt, lt, et, hu, es, mt, el, cs, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0404:04, 26 July 2022DG Regio talk contribs 49,707 bytes +30,057 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 13,047 bytes +1,531 Created claim: summary (P836): Le champ d’application du projet comprend: 1) Modernisation des stations d’épuration des eaux usées — extension de 13.330 EH à 26.884 EH, 2) Modernisation du SUW — 1 pcs., 3) Construction du réseau d’assainissement sanitaire — 1,7 km, 4) Modernisation du réseau d’assainissement sanitaire — 3,0 km, 5) Construction d’un réseau d’alimentation en eau — 0,7 km, 6) Mise en œuvre de systèmes intelligents de gestion des réseaux d’eau et d’assainissement...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,516 bytes +166 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,790 bytes +147 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,643 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,797 bytes +1,426 Created claim: summary (P836): The project’s material scope includes: 1) Modernisation of waste water treatment plant – extension from 13.330 RLM to 26.884 RLM, 2) Modernisation of SUW – 1 pieces, 3) Construction of sanitary sewage system – 1.7 km, 4) Modernisation of sanitary sewage system – 3.0 km, 5) Construction of water supply network – 0.7 km, 6) Implementation of intelligent water and sewage management systems and GIS – pcs. 1 7) Liquidation of waste water treatment pl...
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 10,371 bytes −984 Removed claim: summary (P836): The scope of the project includes:1) Modernisation of the waste water treatment plant — extension from 13.330 p.e. to 26.884 p.e., 2) Modernisation of SUW — 1 units, 3) Construction of the sanitary sewage system — 1.7 km, 4) Modernisation of the sanitary sewerage network — 3.0 km, 5) Construction of water supply network — 0.7 km, 6) Construction of smart water supply systems and the GIS system:(1 7) decommissioning of the treatment plant on a...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 10,068 bytes +984 Created claim: summary (P836): The scope of the project includes:1) Modernisation of the waste water treatment plant — extension from 13.330 p.e. to 26.884 p.e., 2) Modernisation of SUW — 1 units, 3) Construction of the sanitary sewage system — 1.7 km, 4) Modernisation of the sanitary sewerage network — 3.0 km, 5) Construction of water supply network — 0.7 km, 6) Construction of smart water supply systems and the GIS system:(1 7) decommissioning of the treatment plant on a pe...

18 February 2020

8 February 2020

31 January 2020

14 January 2020