Revision history of "Water supply and sewage treatment in Warsaw – Phase V" (Q85203)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 76,720 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 76,720 bytes −428 Set a claim value: summary (P836): O projeto compreende 59 tarefas relacionadas com a gestão de esgotos, 8 tarefas de abastecimento de água, 2 tarefas relacionadas com o sistema central de controlo da rede de esgotos e 17 tarefas relacionadas com a expansão do sistema SIG e os modelos de redes de canais de água. O objetivo do projeto é otimizar e melhorar o atual sistema de gestão da água e dos esgotos: improving the access of residents to the services provided in the field of water...

22 March 2024

15 January 2024

13 December 2023

28 June 2023

14 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 16:4516:45, 2 March 2023DG Regio talk contribs 74,700 bytes +6,435 Changed label, description and/or aliases in lv, da, bg, sk, et, hr, ro, lt, pt, hu, ga, sv, sl, de, nl, mt, el, fi, cs, es, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2017:20, 13 August 2022DG Regio talk contribs 66,153 bytes +39,828 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 15,403 bytes +2,551 Created claim: summary (P836): Le projet comprend 59 tâches de gestion des eaux usées, 8 tâches d’approvisionnement en eau, 2 tâches liées au système de contrôle central du réseau d’assainissement et 17 tâches liées à l’expansion du système SIG et des modèles eau-cannet. L’objectif du projet est d’optimiser et d’améliorer le système actuel de gestion de l’eau et des eaux usées: accroître l’accès des résidents aux services fournis dans le domaine de l’approvisionnement en eau...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 12,852 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 13,155 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 13,041 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 13,146 bytes +1,992 Created claim: summary (P836): The project comprises 59 tasks related to sewage management, 8 water supply tasks, 2 tasks related to the central sewage network control system and 17 tasks related to the expansion of the GIS system and the models of water-channel networks. The aim of the Project is to optimise and improve the current water and sewage management system by: improving the access of residents to the services provided in the field of water supply and waste water as...
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,154 bytes −1,531 Removed claim: summary (P836): The project consists of 59 tasks related to waste water management, 8 water supply tasks, 2 tasks related to the central sewage network control system and 17 tasks related to the development of the GIS system and to the layout of the waterside network models.The aim of the project is to optimise and improve the current water and wastewater management system by:increasing the access to water supply and collecting services for residents as a res...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 11,395 bytes +1,531 Created claim: summary (P836): The project consists of 59 tasks related to waste water management, 8 water supply tasks, 2 tasks related to the central sewage network control system and 17 tasks related to the development of the GIS system and to the layout of the waterside network models.The aim of the project is to optimise and improve the current water and wastewater management system by:increasing the access to water supply and collecting services for residents as a resul...

18 February 2020

8 February 2020

31 January 2020

14 January 2020