Revision history of "Construction of sanitary sewage system in the area of the city of Marki – Stage III" (Q85199)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 54,975 bytes 0 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 54,975 bytes −19 Set a claim value: summary (P836): No âmbito do projeto, prevê-se: — execução de cerca de 14,5 milhas de rede de esgotos. A rede deve ser utilizada por 1 020 Mk e 64 RLM; — construção da estação de captação e tratamento de águas subterrâneas SUW-2, juntamente com a sua ligação ao sistema de abastecimento de água através da construção de uma conduta de água com uma dívida de cerca de 1,0 km; — construção de uma estação de serviço automóvel especializada na limpeza de redes de esgotos...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 51,824 bytes −141 Changed label, description and/or aliases in lv, it, da, sk, nl, et, ro, sv, fi, lt, hu, fr, cs, el, pt, de, ga, mt, sl, bg, hr, es, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0404:04, 26 July 2022DG Regio talk contribs 49,854 bytes +30,073 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 13,127 bytes +1,586 Created claim: summary (P836): Le projet prévoit: — exécution env. 14,5 km de réseau d’assainissement. Le réseau doit être utilisé par 1 020 Mk et 64 EH; — construction d’une station de captage d’eau souterraine et d’une station de traitement de l’eau SUW-2 ainsi que de son raccordement au système d’approvisionnement en eau par la construction d’une conduite principale d’une dette d’environ 1,0 km; — construction d’une station de service automobile spécialisée pour le nettoya...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,541 bytes +187 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,794 bytes +144 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,650 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 11,773 bytes +1,445 Created claim: summary (P836): As part of the project, it is planned to: — execution approx. 14.5 miles of sewerage network. The network is to be used by 1 020 Mk and 64 RLM; — construction of groundwater intake and water treatment station SUW-2 together with its connection to the water supply system through the construction of a water main with a debt of approx. 1,0 km; — construction of a specialised car service station for cleaning sewage networks with facilities for sedim...
  • curprev 15:1615:16, 14 October 2020DG Regio talk contribs 10,328 bytes −870 Removed claim: summary (P836): The aim of the project is to:— execution ca.14.5 km of sewerage network.1 020 Mk and 64 p.e. are to be used;Construction of a groundwater body and treatment plant SG-2 and its connection to the water supply by construction of a water main window of 1.0 km;Construction of a specialist car for cleaning up the sewerage system with sludge management facilities and associated with activities of the Marcs Network Operations Unit;Development of the s...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 9,922 bytes +870 Created claim: summary (P836): The aim of the project is to:— execution ca.14.5 km of sewerage network.1 020 Mk and 64 p.e. are to be used;Construction of a groundwater body and treatment plant SG-2 and its connection to the water supply by construction of a water main window of 1.0 km;Construction of a specialist car for cleaning up the sewerage system with sludge management facilities and associated with activities of the Marcs Network Operations Unit;Development of the sys...

18 February 2020

8 February 2020

31 January 2020

14 January 2020