Revision history of "Reconstruction and extension of waste water treatment plants in Głowno with the construction of a GIS system for existing water and sewage networks" (Q85193)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 57,353 bytes −8 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 57,361 bytes −17 Set a claim value: summary (P836): O projeto deve incluir: — modernização da estação de tratamento Qdśr=2 000 m3/d, RLM = 13 334, a fim de alcançar a qualidade das águas residuais purificadas em conformidade com os requisitos da lei; — construção de 0,99 km de rede de esgotos sanitários e ligação de 95 pessoas; — modernização das estações de bombagem de águas residuais existentes; — construção de um abrigo para a armazenagem de lamas de depuração; — produção de microinstalações fotov...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:1922:19, 2 March 2023DG Regio talk contribs 54,208 bytes +389 Changed label, description and/or aliases in da, it, et, sk, fi, hr, lt, es, hu, ro, ga, fr, pt, lv, bg, sv, de, nl, sl, el, cs, mt, and other parts

5 November 2022

27 October 2022

26 October 2022

21 October 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 13,325 bytes +1,596 Created claim: summary (P836): Le projet comprend: — modernisation de la station d’épuration des eaux usées Qdśr=2 000 m³/j, EH = 13 334, afin d’atteindre la qualité des eaux usées traitées conformément aux exigences de la loi; — construction d’un réseau d’assainissement de 0,99 km et raccordement de 95 personnes; — modernisation des stations de pompage des eaux usées existantes; construction d’un hangar pour le stockage des boues d’épuration; — la construction d’une microins...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,729 bytes +229 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,940 bytes +208 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,732 bytes −202 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,934 bytes +1,461 Created claim: summary (P836): The project shall include: — modernisation of the treatment plant Qdśr=2 000 m³/d, RLM = 13 334, in order to achieve the quality of purified waste water in accordance with the requirements of the law; — construction of 0.99 km of sanitary sewage system and connection of 95 people; — modernisation of existing sewage pumping plants; — construction of a shelter for the storage of sewage sludge; — production of micro photovoltaic installations on a...
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 10,473 bytes −1,029 Removed claim: summary (P836): The project includes:Modernisation of the sewage treatment plant Qdder = 2 000 m³/d, p.e. = 13 334, in order to achieve the quality of treated wastewater which complies with the requirements of the law;Construction of 0.99 km of sewerage network and connection of 95 persons;Upgrading of existing wastewater pumping stations;Construction of the wind for the storage of sewage sludge;The installation of a micro-photovoltaic installation into a was...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 10,215 bytes +1,029 Created claim: summary (P836): The project includes:Modernisation of the sewage treatment plant Qdder = 2 000 m³/d, p.e. = 13 334, in order to achieve the quality of treated wastewater which complies with the requirements of the law;Construction of 0.99 km of sewerage network and connection of 95 persons;Upgrading of existing wastewater pumping stations;Construction of the wind for the storage of sewage sludge;The installation of a micro-photovoltaic installation into a waste...

18 February 2020

8 February 2020

31 January 2020

14 January 2020