Revision history of "Extension and modernisation of the water and sewage infrastructure of the Włoszakowice Agglomeration – Stage I" (Q85192)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

3 March 2023

  • curprev 00:3000:30, 3 March 2023DG Regio talk contribs 41,221 bytes −218 Changed label, description and/or aliases in lv, et, pt, nl, fi, sl, it, hr, el, ga, de, mt, es, fr, lt, da, sv, sk, ro, cs, bg, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2017:20, 13 August 2022DG Regio talk contribs 39,325 bytes +22,569 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,839 bytes +1,095 Created claim: summary (P836): Le projet couvre le champ d’application: — Construction d’un système d’assainissement sanitaire 22,4 km (connexion de 1675 EH); — Construction d’un réseau d’approvisionnement en eau 0,7 km; — Reconstruction du réseau d’approvisionnement en eau 5,9 km., translated_summary
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 10,744 bytes +191 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0610:06, 4 March 2020DG Regio talk contribs 9,243 bytes +586 Created claim: summary (P836): The project covers the following:— Construction of a sanitary sewerage system of 22.4 km (connection 1675 p.e.);— Construction of a water supply network of 0.7 km;Construction of 5.9 km water supply network., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020