Revision history of "Development of the municipal sewage treatment plant in the town of Kościelny" (Q85179)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 46,212 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 46,211 bytes −2 Set a claim value: summary (P836): O âmbito do projeto inclui a ampliação da estação de tratamento de águas residuais na cidade de Kościelny para uma capacidade de 490 m3/d e 4335 RLM. A execução do projeto permitirá adaptar a estação de tratamento de águas residuais aos requisitos de qualidade do tratamento de águas residuais, em conformidade com o regulamento.

12 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 43,043 bytes +137 Changed label, description and/or aliases in da, it, sk, fi, sv, ga, sl, cs, hu, lv, el, ro, fr, hr, pt, nl, de, lt, es, et, bg, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 September 2022

26 July 2022

  • curprev 04:0404:04, 26 July 2022DG Regio talk contribs 40,785 bytes +23,668 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 11,957 bytes +1,126 Created claim: summary (P836): Le projet comprend l’extension de la station d’épuration de Mieastków Kościelny à une capacité de 490 m³/j et 4335 EH. La mise en œuvre du projet permettra d’adapter la station d’épuration des eaux usées aux exigences de qualité du traitement des eaux usées conformément au règlement., translated_summary
  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 10,831 bytes +147 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,124 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 10,988 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,122 bytes +1,133 Created claim: summary (P836): The scope of the project includes the extension of the sewage treatment plant in Kościelny Town to a capacity of 490 m³/d and 4335 RLM. The implementation of the project will allow to adapt the sewage treatment plant to the requirements of the quality of waste water treatment in accordance with the Regulation., translated_summary
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 9,989 bytes −694 Removed claim: summary (P836): The scope of the project consists of an extension of the wastewater treatment plant in Miasto Kościelny to a capacity of 490 m³/d and 4335 p.e..The project will allow the waste water treatment plant to be brought into line with the requirements of the quality of waste water treatment in accordance with the Regulation., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 9,396 bytes +694 Created claim: summary (P836): The scope of the project consists of an extension of the wastewater treatment plant in Miasto Kościelny to a capacity of 490 m³/d and 4335 p.e..The project will allow the waste water treatment plant to be brought into line with the requirements of the quality of waste water treatment in accordance with the Regulation., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020