Revision history of "Target solution for waste water management for the city of Wrocław – Phase I" (Q85178)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 53,448 bytes −6 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 53,454 bytes −102 Set a claim value: summary (P836): O projeto é realizado na aglomeração de Wrocław. Âmbito de aplicação material: —construção da rede de esgotos -22,3 km, -reconstrução da rede de esgotos – 4,01 km, -construção da rede de abastecimento de água – 4,58 km, -reconstrução do abastecimento de água – 4,88 km, -construção do sistema de esgotos na rede de canais na área da estação de bombagem Porto Sul (4 tanques de restauração), -entrega e instalação do sistema de cogeração CHP em Woś, -med...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 51,888 bytes +911 Changed label, description and/or aliases in it, sk, da, sv, lv, fi, sl, ro, de, cs, pt, fr, hr, lt, nl, es, hu, ga, et, el, bg, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2017:20, 13 August 2022DG Regio talk contribs 47,655 bytes +28,102 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 12,971 bytes +1,610 Created claim: summary (P836): Le projet est réalisé dans les locaux de l’agglomération de Wrocław. Champ d’application matériel: —construction d’un réseau d’assainissement — 22,3 km, — reconstruction du réseau d’assainissement — 4,01 km, -construction d’un réseau d’alimentation en eau — 4,58 km, -reconstruction d’un réseau d’approvisionnement en eau — 4,88 km, -construction d’un système de rétention sur le réseau de canalisations de Port Południe (4 réservoirs de rétention),...
  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 11,361 bytes +141 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,660 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,522 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,647 bytes +1,319 Created claim: summary (P836): The project is carried out in the Wrocław Agglomeration. Material scope: —construction of sewage network -22.3 km, -reconstruction of sewage network – 4.01 km, -construction of water supply network – 4.58 km, -reconstruction of water supply – 4.88 km, -building of the sewage system on the channel network in the area of the pumping plant Port South (4 Restoration tanks), -delivery and installation of CHP cogeneration system on Woś, -ISIS measurem...
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 10,328 bytes −1,061 Removed claim: summary (P836): Project implemented in the Wrocław agglomeration.Material scope:— construction of a sewage network — 22.3 km — extension of the sewerage network — 4.01 km — construction of a water supply network — 4.58 km, -construction of a water supply network — 4.88 km, -construction of a water supply network — km, -construction of a retention system for the network in the coastal pumping station of the Port of South (4 retention basins), -supply and insta...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 10,100 bytes +1,061 Created claim: summary (P836): Project implemented in the Wrocław agglomeration.Material scope:— construction of a sewage network — 22.3 km — extension of the sewerage network — 4.01 km — construction of a water supply network — 4.58 km, -construction of a water supply network — 4.88 km, -construction of a water supply network — km, -construction of a retention system for the network in the coastal pumping station of the Port of South (4 retention basins), -supply and install...

18 February 2020

8 February 2020

31 January 2020

14 January 2020