Revision history of "Water and sewage management in Kedzierzyn-Koźle" (Q85174)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 48,354 bytes +12 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 48,342 bytes +2 Set a claim value: summary (P836): Prevê-se que o projeto: —construção de um sistema de esgotos sanitários a 9,28 km. —modernização das estações de tratamento de água — peças2 — implementação do sistema inteligente de gestão da água e das águas residuais — pcs.1 Indicador básico de resultados diretos: Número de novos utilizadores da rede de esgotos que aderirão ao sistema de esgotos sanitários em resultado do projeto 836 RLM.

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:1222:12, 2 March 2023DG Regio talk contribs 45,171 bytes +317 Changed label, description and/or aliases in da, bg, sk, el, lv, ro, et, fr, sl, ga, pt, cs, fi, sv, hr, de, es, lt, hu, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:2017:20, 13 August 2022DG Regio talk contribs 42,732 bytes +25,092 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 12,256 bytes +1,269 Created claim: summary (P836): Le projet prévoit: construction d’un système d’assainissement de 9,28 km. —modernisation des stations de traitement de l’eau — pcs.2 — mise en œuvre du système intelligent de gestion du réseau d’eau et d’assainissement — pcs.1 Indicateur de résultat direct de base: Nombre de nouveaux utilisateurs du réseau d’assainissement qui rejoindront le réseau d’assainissement à la suite de la mise en œuvre du projet 836 EH., translated_summary
  • curprev 21:0321:03, 30 November 2021DG Regio talk contribs 10,987 bytes +118 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,309 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,202 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 11,311 bytes +1,186 Created claim: summary (P836): The project is planned to: —construction of sanitary sewage system 9.28 km. —modernisation of water treatment stations -pieces2 – implementation of the Intelligent Water and Sewerage Management System – pcs.1 Basic direct result indicator: Number of new users of the sewage network who will join the sanitary sewage system as a result of the 836 RLM project., translated_summary
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 10,125 bytes −811 Removed claim: summary (P836): The project is intended to:Construction of a sanitary sewage system of 9.28 km.Modernisation of the water treatment plant — unit 2 — implementation of the intelligent system for the management of water and sewerage networks — unit 1: direct result indicator: direct result indicator:The number of new users of the sewage system will connect to the sanitary sewerage network as a result of the implementation of the 836 p.e. project., remove_old_en...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 9,649 bytes +811 Created claim: summary (P836): The project is intended to:Construction of a sanitary sewage system of 9.28 km.Modernisation of the water treatment plant — unit 2 — implementation of the intelligent system for the management of water and sewerage networks — unit 1: direct result indicator: direct result indicator:The number of new users of the sewage system will connect to the sanitary sewerage network as a result of the implementation of the 836 p.e. project., Adding English...

18 February 2020

8 February 2020

31 January 2020

14 January 2020