Revision history of "Continuation of the order of water and waste water management in Malbork and the extension of the sewage treatment plant in Kaldów Village" (Q85161)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 56,769 bytes −25 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 56,794 bytes −18 Set a claim value: summary (P836): O projeto diz respeito a: — construção de 3,04 km de rede de esgotos sanitários, — construção de 0,98 km de rede de abastecimento de água, — reconstrução de 1,87 km de rede de abastecimento de água, — ampliação/modernização da estação de tratamento de águas residuais (reconstrução 2 de 3 — a terceira foi acrescentada no âmbito do projeto POIiŚ 2007-2013 — biorreatores de lamas existentes, entre outros, substituição de sistemas de arejamento e recons...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 53,642 bytes +42 Changed label, description and/or aliases in lv, it, sk, da, et, fr, bg, ro, fi, hu, es, hr, sl, ga, pt, cs, sv, nl, el, lt, de, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:1917:19, 13 August 2022DG Regio talk contribs 51,493 bytes +31,201 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 13,339 bytes +1,605 Created claim: summary (P836): Le projet concerne: — construction de 3,04 km de réseau d’assainissement sanitaire, — construction de 0,98 km de réseau d’approvisionnement en eau, — reconstruction de 1,87 km de réseau d’approvisionnement en eau, — extension/modernisation des stations d’épuration des eaux usées (reconstruction 2 sur 3 — troisième a été ajoutée dans le cadre du projet OPIiE 2007-2013 — bioréacteurs actifs des boues existantes, entre autres remplacement des systè...
  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 11,734 bytes +228 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,946 bytes +199 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,747 bytes −222 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,969 bytes +1,470 Created claim: summary (P836): The project concerns: — construction of 3.04 km of sanitary sewage system, – construction of 0.98 km of water supply network, – reconstruction of 1.87 km of water supply network, – extension/modernisation of sewage treatment plant (reconstruction 2 out of 3 – the third was added as part of the project POIiŚ 2007-2013 – existing bioreactors of sludge, among others, replacement of aeration systems and reconstruction of condensation stations of exc...
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 10,499 bytes −1,024 Removed claim: summary (P836): The project concerns:— construction of 3.04 km of sanitary sewage system, — construction of 0.98 km of water supply network, — reconstruction of 1.87 km of water supply network, extension/upgrade of the waste water treatment plant (conversion of 2 from 3 to third) was to be completed under the OPI & E project 2007-2013 — existing sludge bio-reactors, inter alia, the exchange of aeration systems and reconstruction of the excess sludge compactio...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 10,242 bytes +1,024 Created claim: summary (P836): The project concerns:— construction of 3.04 km of sanitary sewage system, — construction of 0.98 km of water supply network, — reconstruction of 1.87 km of water supply network, extension/upgrade of the waste water treatment plant (conversion of 2 from 3 to third) was to be completed under the OPI & E project 2007-2013 — existing sludge bio-reactors, inter alia, the exchange of aeration systems and reconstruction of the excess sludge compaction...

18 February 2020

8 February 2020

31 January 2020

14 January 2020