Revision history of "Ordering water and sewage management in the municipality of Świdnica" (Q85160)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 55,272 bytes −1,790 Changed label, description and/or aliases in lv, da, bg, sk, et, hr, lt, pt, ro, es, ga, hu, fr, sv, de, cs, sl, el, nl, mt, fi, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0304:03, 26 July 2022DG Regio talk contribs 54,950 bytes +33,919 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 13,655 bytes +1,837 Created claim: summary (P836): Le projet comprend: — construction de 2,89 km de réseau d’assainissement sanitaire, — reconstruction de 2,6 km de réseau d’assainissement sanitaire, — rénovation (sèchement) 2,4 km de réseau d’assainissement sanitaire, — construction de 5,45 km de réseau d’approvisionnement en eau, — démantèlement de la station d’épuration des eaux usées de Komorów qui a été fermée depuis plusieurs années, — achat d’un véhicule de drainage pour l’exploitation du...
  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 11,818 bytes +143 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 12,115 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,987 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 12,103 bytes +1,595 Created claim: summary (P836): The project shall include: — construction of 2.89 km of sanitary sewage system, – reconstruction of 2.6 km of sanitary sewage system, – renovation (sealing) 2.4 km of sanitary sewage system, – construction of 5.45 km of water supply network, – liquidation of a sewage treatment plant closed for several years in Komorów, – purchase of a sewage tank for operation of the network. Output indicators: — length of built sanitary sewage system – 2.89 km...
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 10,508 bytes −1,223 Removed claim: summary (P836): The project includes:Construction of 2.89 km of sanitary sewage system, — reconstruction of 2.6 km of sanitary sewage system, — renovation (sealing) of 2.4 km of sanitary sewage system, — construction of 5.45 km of water supply network, — closure of the non-active sewage treatment plant for several years in the municipality of Komorów, — the purchase of an aseptic car for the operation of the network.Product indicators:— length of the built se...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 10,445 bytes +1,223 Created claim: summary (P836): The project includes:Construction of 2.89 km of sanitary sewage system, — reconstruction of 2.6 km of sanitary sewage system, — renovation (sealing) of 2.4 km of sanitary sewage system, — construction of 5.45 km of water supply network, — closure of the non-active sewage treatment plant for several years in the municipality of Komorów, — the purchase of an aseptic car for the operation of the network.Product indicators:— length of the built sewa...

18 February 2020

8 February 2020

31 January 2020

14 January 2020