Revision history of "Construction of sewage system in Wieliczka Municipality – stage IV" (Q85159)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 57,246 bytes +6 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 57,240 bytes −76 Set a claim value: summary (P836): O projeto é executado no município de Wieliczka, na área da aglomeração de Cracóvia, com uma dimensão de 925 500 RLM. O âmbito do projeto inclui: — construção de 98,74 km de rede de esgotos sanitários, — construção de 8,30 km de rede de abastecimento de água, — construção de cerca de 1,99 km de drenagem de águas pluviais, — construção de ZUW em Wieliczka com uma capacidade de 360 m3/h (para abastecer cerca de 30 pessoas) juntamente com tiro em alto...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 54,146 bytes +920 Changed label, description and/or aliases in it, da, es, sk, sv, cs, bg, lt, de, fi, hr, ga, et, el, lv, pt, ro, fr, hu, sl, mt, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0304:03, 26 July 2022DG Regio talk contribs 51,115 bytes +30,766 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 13,346 bytes +1,710 Created claim: summary (P836): Le projet est mis en œuvre dans la municipalité de Wieliczka, dans la zone d’agglomération de Cracovie, avec une taille de 925 500 EH. La portée du projet comprend: — construction de 98,74 km de réseau d’assainissement sanitaire, — construction de 8,30 km de réseau d’adduction d’eau, — construction d’env. 1,99 km d’eau de pluie, — construction de ZUW à Wieliczka d’une capacité de 360 m³/h (pour la fourniture env. 30 000 personnes) avec un plan d...
  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 11,636 bytes +151 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,925 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,798 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,938 bytes +1,551 Created claim: summary (P836): The project is implemented in Wieliczka Municipality, in the area of the Kraków Agglomeration with a size of 925.500 RLM. The scope of the project includes: — construction of 98.74 km of sanitary sewage system, – construction of 8.30 km of water supply network, – construction of approx. 1.99 km of rainwater drainage, – construction of ZUW in Wieliczka with a capacity of 360 m³/h (to supply approx. 30, people) together with deep-sea shot, – const...
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 10,387 bytes −1,118 Removed claim: summary (P836): The project is being carried out in the municipality of Wieliczka, in the Kraków agglomeration of 925.500 p.e.The scope of the project includes:Construction of 98.74 km of sewerage network, construction of 8.30 km of water supply network, construction ca.1.99 km of storm water sewerage — construction of ZUW in Wieliczka with a capacity of 360 m³/h (to supply ca.30 persons) with deep sea vision, construction of the ZUW in Hungary with a gain of...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 10,216 bytes +1,118 Created claim: summary (P836): The project is being carried out in the municipality of Wieliczka, in the Kraków agglomeration of 925.500 p.e.The scope of the project includes:Construction of 98.74 km of sewerage network, construction of 8.30 km of water supply network, construction ca.1.99 km of storm water sewerage — construction of ZUW in Wieliczka with a capacity of 360 m³/h (to supply ca.30 persons) with deep sea vision, construction of the ZUW in Hungary with a gain of c...

18 February 2020

8 February 2020

31 January 2020

14 January 2020