Revision history of "Modernisation of the existing waste sorting plant in Giedlarowa, Leżajsk commune, run by Stare Miasto-Park Sp. z o.o." (Q85153)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 80,649 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 80,647 bytes −20 Set a claim value: summary (P836): O principal objetivo é modernizar a instalação de Giedlarowa, a fim de aumentar a quantidade de resíduos valorizados e reciclados. A modernização da instalação é uma resposta à atual escassez de sistemas. Consequentemente, a instalação aumentará o número de frações de resíduos selecionadas, que podem ser ajustadas em função das condições de mercado relacionadas com a possibilidade de eliminação de matérias-primas triadas. A remodelação da sala de tr...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 77,497 bytes +143 Changed label, description and/or aliases in lv, it, da, sk, ro, fr, fi, sv, hr, et, sl, ga, lt, de, hu, pt, bg, nl, es, mt, cs, el, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:1917:19, 13 August 2022DG Regio talk contribs 75,239 bytes +48,560 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 16,115 bytes +2,594 Created claim: summary (P836): L’objectif principal est de moderniser l’usine de Giedlarowa afin d’augmenter la quantité de déchets valorisés et recyclables. La modernisation de l’installation est une réponse à la pénurie actuelle du système. En conséquence, l’installation augmentera le nombre de fractions de déchets sélectionnées, qui pourront être ajustées en fonction des conditions du marché associées à l’élimination des matières premières triées. La reconstruction de la s...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 13,521 bytes +209 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 13,752 bytes +178 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 13,574 bytes −190 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 13,764 bytes +2,373 Created claim: summary (P836): The main objective is to modernise Giedlarowa’s installation to increase the amount of waste recovered and recycled. Modernisation of the installation is a response to current system shortages. As a result, the installation will increase the number of selected waste fractions, which can be adjusted depending on market conditions related to the possibility of disposing of sorted raw materials. The remodeling of the sorting hall will consist of it...
  • curprev 15:0315:03, 14 October 2020DG Regio talk contribs 11,391 bytes −1,938 Removed claim: summary (P836): The main objective is to upgrade the Gedlarval installation to increase the amount of recovered and recycled waste.The modernisation of the installation is a response to the current deficiencies in the system.As a result, the installation will increase the number of waste fractions that are selected, which may be adjusted depending on the market context of disposing of sorted raw materials.The reconstruction of the sorting hall will be based o...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 12,038 bytes +1,938 Created claim: summary (P836): The main objective is to upgrade the Gedlarval installation to increase the amount of recovered and recycled waste.The modernisation of the installation is a response to the current deficiencies in the system.As a result, the installation will increase the number of waste fractions that are selected, which may be adjusted depending on the market context of disposing of sorted raw materials.The reconstruction of the sorting hall will be based on...

18 February 2020

8 February 2020

31 January 2020

14 January 2020