Revision history of "Construction of the Selective Point of the Municipal Waste Collection in Siemianowice Śląskie with the necessary equipment" (Q85125)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 59,721 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:4315:43, 13 October 2024DG Regio talk contribs 59,718 bytes −97 Set a claim value: summary (P836): 1. Trabalhos preparatórios: desenvolvimento da documentação do projecto, estudo de viabilidade e actualização do projecto. 2. Trabalhos de investimento: — Obras de construção e instalação relacionadas com a construção de instalações do PSZOK, ou seja, armazém, mundo do armazém, contentor de escritório social, contentor porteiro, — equipamento do PSZOK (contentores de resíduos, contentores, peso do automóvel), — Aquisição de contentores para recolha...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 56,645 bytes +1,836 Changed label, description and/or aliases in it, lv, fr, da, ro, es, bg, sk, fi, el, de, sv, et, sl, hu, cs, pt, ga, lt, hr, mt, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:1917:19, 13 August 2022DG Regio talk contribs 52,688 bytes +32,054 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 13,474 bytes +1,662 Created claim: summary (P836): 1. Travaux préparatoires: préparation de la documentation du projet, étude de faisabilité et mise à jour de celle-ci. 2. Travaux d’investissement: — Travaux de construction et d’installation liés à la construction d’installations PSZOK, à savoir une salle de stockage, un hangar de stockage, un conteneur de bureau social, un conteneur de porteur, — un équipement PSZOK (conteneurs de déchets, conteneurs, écailles de voiture), — achat de conteneurs...
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 11,812 bytes +176 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 12,076 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 11,892 bytes −176 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 12,068 bytes +1,495 Created claim: summary (P836): 1. Preparatory work: development of project documentation, feasibility study and updating of the project. 2. Investment work: — Construction and installation works related to the construction of PSZOK facilities, i.e. warehouse hall, warehouse world, social office container, porter container, – PSZOK equipment (waste containers, containers, car weight), – Purchase of containers for selective collection of biodegradable waste and public container...
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 10,573 bytes −1,116 Removed claim: summary (P836): 1.Preparatory works:development of project documentation, feasibility study and update of the investment.2.Investment work:— Construction and installation works associated with the construction of PSZOK facilities, i.e. storage, storage and storage facilities, patient and social/office container, container porternia, PSZOK equipment (waste containers, containers, car scales), — Purchase of containers for the separate collection of biodegradabl...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 10,400 bytes +1,116 Created claim: summary (P836): 1.Preparatory works:development of project documentation, feasibility study and update of the investment.2.Investment work:— Construction and installation works associated with the construction of PSZOK facilities, i.e. storage, storage and storage facilities, patient and social/office container, container porternia, PSZOK equipment (waste containers, containers, car scales), — Purchase of containers for the separate collection of biodegradable...

18 February 2020

8 February 2020

31 January 2020

14 January 2020