Revision history of "Biebrza Waste Management System – stage III – PSZOKI" (Q85110)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 91,613 bytes −5 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 91,618 bytes +33 Set a claim value: summary (P836): O projeto prevê a construção de 9 PSZOK (Região de Gestão de Resíduos do Norte, zona separada de Koszarówka de acordo com o PGO) em relação a 15 planeados para a construção de PPSZOK incluídos no Plano de Investimento para a Gestão de Resíduos do Voivodato da Podláquia para os anos 2016-2022 na Região do Norte, uma zona separada de Koszarówka. Expansão (modernização) de 2 Pontos da Recolha de Resíduos Municipais, um dos quais está localizado na zona...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 89,916 bytes −708 Changed label, description and/or aliases in da, it, sk, cs, bg, sv, de, lt, fi, hr, ga, et, lv, pt, es, el, ro, fr, hu, sl, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0204:02, 26 July 2022DG Regio talk contribs 88,519 bytes +58,149 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 17,879 bytes +3,298 Created claim: summary (P836): Le projet prévoit de construire 9 PSZOK (région nord de la gestion des déchets, zone du BPG de Koszarówka), contre 15 prévus pour la construction du PSZOK inclus dans le plan de gestion des déchets de la région de Podlaskie pour 2016-2022 dans la région septentrionale, une zone distincte de Koszarówka. Extension (modernisation) de 2 points de la collecte sélective des déchets municipaux, dont l’un est situé dans la région du Centre selon le BPG....
  • curprev 16:3316:33, 30 November 2021DG Regio talk contribs 14,581 bytes +124 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 14,897 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 14,782 bytes −124 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 14,906 bytes +3,091 Created claim: summary (P836): The project plans to build 9 PSZOK (North Waste Management Region, separate area of Koszarówka according to PGO) in relation to 15 planned for the construction of PPSZOK included in the Investment Plan for Waste Management of Podlaskie Voivodship for the years 2016-2022 in the Northern Region, a separate area of Koszarówka. Expansion (modernisation) of 2 Points of the Municipal Waste Collection, one of which is located in the area of the Central...
  • curprev 15:0215:02, 14 October 2020DG Regio talk contribs 11,815 bytes −2,473 Removed claim: summary (P836): The project envisages the construction of 9 PSZOK (Norte Region of Waste, Area of Waste according to PGO) in relation to the 15 plans planned for the construction of PSZOK included in the Investment Plan of the Regional Waste Management Plan for 2016-2022 in the Norte region, a separate area of Koszalin.Expansion (upgrade) 2 Points of selective municipal waste collection points, of which one located in the Region of the Central Region accordin...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0510:05, 4 March 2020DG Regio talk contribs 13,001 bytes +2,473 Created claim: summary (P836): The project envisages the construction of 9 PSZOK (Norte Region of Waste, Area of Waste according to PGO) in relation to the 15 plans planned for the construction of PSZOK included in the Investment Plan of the Regional Waste Management Plan for 2016-2022 in the Norte region, a separate area of Koszalin.Expansion (upgrade) 2 Points of selective municipal waste collection points, of which one located in the Region of the Central Region according...

18 February 2020

8 February 2020

31 January 2020

14 January 2020