Revision history of "Development of the rainwater management system in Gdynia – Part II" (Q85070)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 67,620 bytes 0 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 67,620 bytes −50 Set a claim value: summary (P836): O projeto abrangeu 4 tarefas de investimento localizadas em bacias hidrográficas com uma área total de 69,74 ha, incluindo: Zad.1.Reconstrução do sistema de drenagem na zona do distrito de Witomino, em Gdynia, com a construção de um tanque de retenção (POW. 60,00 ha); Zad.2.Desenvolvimento de águas pluviais no complexo de instalações educativas, juntamente com campos desportivos e sistema de estradas de acesso no distrito de Chwarzno-Wiczlino em Gdy...

22 March 2024

13 December 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:1917:19, 13 August 2022DG Regio talk contribs 64,527 bytes +40,478 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 14,892 bytes +2,223 Created claim: summary (P836): Le projet couvrait 4 projets d’investissement situés dans des bassins versants d’une superficie totale de 69,74 hectares, dont: Zad.1.Reconstruction du système de drainage dans le district de Witomino à Gdynia, ainsi que construction d’un réservoir de rétention (POW. 60,00 ha); Zad.2.Établissement de l’eau de pluie dans le complexe d’installations éducatives ainsi que des zones sportives et du réseau routier d’accès dans le district de Chwarzno-...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 12,669 bytes +138 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 12,971 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 12,844 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 12,971 bytes +2,006 Created claim: summary (P836): The project covered 4 investment tasks located in water catchments with a total area of 69.74 ha, including: Zad.1.Reconstruction of the drainage system in the area of Witomino district in Gdynia with the construction of a retention tank (POW. 60,00 ha); Zad.2.Development of rainwater within the complex of educational facilities together with sports grounds and access road system in the district Chwarzno-Wiczlino in Gdynia (POW. 5,79 ha); Zad.3....
  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 10,965 bytes −1,497 Removed claim: summary (P836): The project included 4 investment projects in catchments with a total area of 69.74 ha, including:Zad.1.Reconstruction of the drainage system in the Witomino district in Gdynia and the construction of the reservoir (area).60.00 ha);Zad.2.Management of storm water within a group of educational facilities, including sports and access areas, in Chwarzno-Wiślino in Gdynia.5.79 ha);Zad.3.Building a storm-water management system in the Mexico settle...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 11,175 bytes +1,497 Created claim: summary (P836): The project included 4 investment projects in catchments with a total area of 69.74 ha, including:Zad.1.Reconstruction of the drainage system in the Witomino district in Gdynia and the construction of the reservoir (area).60.00 ha);Zad.2.Management of storm water within a group of educational facilities, including sports and access areas, in Chwarzno-Wiślino in Gdynia.5.79 ha);Zad.3.Building a storm-water management system in the Mexico settleme...

18 February 2020

8 February 2020

31 January 2020

14 January 2020