Revision history of "Improving flood safety for the City of Gliwice through modernisation and expansion of the rainwater management system – stage II" (Q85066)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 89,471 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 89,472 bytes +24 Set a claim value: summary (P836): O principal objetivo do projeto é resolver os problemas de gestão das águas pluviais e pluviais na área da cidade de Gliwice, melhorando o fluxo de drenagem das águas pluviais e criando possibilidades de retenção de água. O projeto contribuirá para melhorar a capacidade de retenção das águas pluviais, cumprindo as normas polacas e europeias relativas à gestão das águas pluviais na cidade de Gliwice, e permitirá uma gestão mais eficiente da rede de á...

12 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:0421:04, 2 March 2023DG Regio talk contribs 87,780 bytes −939 Changed label, description and/or aliases in da, sk, lv, hr, es, ga, et, fi, fr, ro, el, sv, pt, hu, de, lt, nl, cs, sl, mt, bg, it, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0104:01, 26 July 2022DG Regio talk contribs 86,623 bytes +56,793 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 17,428 bytes +2,985 Created claim: summary (P836): L’objectif principal du projet est de résoudre les problèmes de gestion de l’eau de pluie dans la ville de Gliwice en améliorant le débit dans le réseau d’eau de pluie et en créant des possibilités de rétention d’eau. Le projet permettra d’améliorer la capacité de rétention des eaux de pluie, d’atteindre les normes et normes polonaises et européennes relatives à la gestion de l’eau de pluie dans la ville de Gliwice, ainsi que de permettre une ge...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 14,443 bytes +223 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 14,660 bytes +190 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 14,470 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 14,652 bytes +2,729 Created claim: summary (P836): The main objective of the project is to solve problems of rain and rainwater management in the Gliwice City area by improving the flow of rainwater drainage and creating water retention possibilities. The project will contribute to improving the capacity of rainwater retention, achieving Polish and European standards and standards relating to rainwater management in the City of Gliwice, and will enable more efficient management of the rainwater...
  • curprev 15:0115:01, 14 October 2020DG Regio talk contribs 11,923 bytes −2,290 Removed claim: summary (P836): The main objective of the project is to address rainwater and rain management problems in the area of Gliwice by improving flow in the storm-water system and by creating water retention opportunities.The project will improve the water retention capacity of rainwater, the achievement of Polish and European standards and standards for rainwater management in the area of Gliwice and will allow for a more efficient management of the storm water sy...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 12,936 bytes +2,290 Created claim: summary (P836): The main objective of the project is to address rainwater and rain management problems in the area of Gliwice by improving flow in the storm-water system and by creating water retention opportunities.The project will improve the water retention capacity of rainwater, the achievement of Polish and European standards and standards for rainwater management in the area of Gliwice and will allow for a more efficient management of the storm water syst...

18 February 2020

8 February 2020

31 January 2020

14 January 2020