Revision history of "Development of rainwater and melting waters along with water retention in the Municipality of Starogard Gdański" (Q85055)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 89,928 bytes +4 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 89,924 bytes +47 Set a claim value: summary (P836): Tarefa 1.1. Construção de um sistema de drenagem de águas pluviais que recolhe as águas pluviais na zona da ul. Iwaszkiewicza para o reservatório previsto O investimento previsto destina-se a aliviar a carga de drenagem de águas pluviais na bacia hidrográfica analisada e a atrasar o caudal superficial. A construção de um novo colector de águas pluviais, ao qual será ligada a rede de drenagem existente, permitirá a drenagem de águas pluviais e de deg...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 86,707 bytes −1,056 Changed label, description and/or aliases in it, da, sk, et, de, hr, bg, fi, es, ga, lv, pt, cs, sv, hu, fr, nl, ro, el, lt, sl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0104:01, 26 July 2022DG Regio talk contribs 85,653 bytes +56,126 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2316:23, 30 November 2021DG Regio talk contribs 17,501 bytes +3,110 Created claim: summary (P836): Tâche 1.1. Construction d’un système d’eau de pluie collectant l’eau de pluie dans la zone d’ul. Iwaszkiewicza jusqu’au réservoir prévu L’investissement prévu vise à soulager le système de drainage pluvial dans le bassin hydrographique analysé et à retarder le ruissellement. La construction d’un nouveau collecteur d’eau de pluie, auquel le réseau de drainage existant sera raccordé, permettra de déverser les eaux de pluie et les eaux de fonte dan...
  • curprev 16:2316:23, 30 November 2021DG Regio talk contribs 14,391 bytes +174 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 14,657 bytes +172 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 14,485 bytes −169 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 14,654 bytes +2,768 Created claim: summary (P836): Task 1.1. Construction of a rainwater drainage system collecting rainwater in the area of ul. Iwaszkiewicza to the planned storage tank The planned investment is intended to relieve the load of rainwater drainage in the analysed catchment area and delay the surface flow. The construction of a new rainwater manifold, to which the existing drainage network will be attached, will allow for drainage of rainwater and meltwater to the built reservoir....
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 11,886 bytes −2,418 Removed claim: summary (P836): Target 1.1.Construction of storm water collecting system in the area ul.The aim of the planned retention reservoir of Ivashkevich to the planned retention reservoir is to ease the flow of the storm water in the catchment area under consideration and to delay the run-off of the surface run-off.Construction of a new rainwater collector to which an existing drainage system will be connected will permit rainwater and mites to drain into the water...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 13,024 bytes +2,418 Created claim: summary (P836): Target 1.1.Construction of storm water collecting system in the area ul.The aim of the planned retention reservoir of Ivashkevich to the planned retention reservoir is to ease the flow of the storm water in the catchment area under consideration and to delay the run-off of the surface run-off.Construction of a new rainwater collector to which an existing drainage system will be connected will permit rainwater and mites to drain into the water st...

18 February 2020

8 February 2020

31 January 2020

14 January 2020