Revision history of "Development of rainwaters in the town of Gorzowa Wlkp. — Stage I" (Q85051)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 63,862 bytes +10 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 63,852 bytes −15 Set a claim value: summary (P836): Zad.1: Desenvolvimento das águas pluviais na bacia hidrográfica ul. Jogos Olímpicos, Fig.2: Desenvolvimento das águas pluviais na bacia hidrográfica ul. Eslavo, Zad.3: Desenvolvimento das águas pluviais na bacia hidrográfica ul. Esmeralda, fig. 4: Desenvolvimento das águas pluviais na bacia hidrográfica ul. Gravel, o custo total do projecto está estimado em 63 353 221,66 PLN. Métodos naturais ou naturais são utilizados no projeto. A utilização previ...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

3 March 2023

  • curprev 00:0100:01, 3 March 2023DG Regio talk contribs 62,198 bytes +972 Changed label, description and/or aliases in da, it, sk, fi, ga, de, bg, hu, sv, pt, et, ro, mt, hr, sl, el, cs, lt, fr, es, nl, lv, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 04:0104:01, 26 July 2022DG Regio talk contribs 59,118 bytes +36,237 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2316:23, 30 November 2021DG Regio talk contribs 14,417 bytes +2,034 Created claim: summary (P836): Zad.1: Gestion des eaux de pluie dans le bassin versant ul. Olympic, Zad.2: Gestion des eaux de pluie dans le bassin versant ul. Slavic, Zad.3: Gestion des eaux de pluie dans le bassin versant ul. Émeraude, règle 4: Gestion des eaux de pluie dans le bassin versant ul. Gravier, Le coût total du projet est estimé à 63 353 221,66 PLN. Le projet utilise des méthodes naturelles ou naturelles. L’utilisation prévue de l’eau de pluie dans le projet est...
  • curprev 16:2316:23, 30 November 2021DG Regio talk contribs 12,383 bytes +114 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,709 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,584 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 12,700 bytes +1,796 Created claim: summary (P836): Zad.1: Development of rainwater in the water catchment area ul. Olympics, Fig.2: Development of rainwater in the water catchment area ul. Slavic, Zad.3: Development of rainwater in the water catchment area ul. Emerald, Fig.4: Development of rainwater in the water catchment area ul. Gravel, the total cost of the project is estimated at PLN 63 353 221.66. Natural or natural methods are used in the project. The planned use of rainwater in the proje...
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 10,904 bytes −1,503 Removed claim: summary (P836): Zad.1:Water management in the catchment area of the river.For Olympic, Zad.2:Water management in the catchment area of the river.Slavic, Zad.3:Water management in the catchment area of the river.Passion fruit, Zad.4:Water management in the catchment area of the river.The gravel, the total cost of the project is estimated at PLN 63 353 221,66.The project uses natural or natural based methods.The way in which the rainwater is to be used in the p...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 11,125 bytes +1,503 Created claim: summary (P836): Zad.1:Water management in the catchment area of the river.For Olympic, Zad.2:Water management in the catchment area of the river.Slavic, Zad.3:Water management in the catchment area of the river.Passion fruit, Zad.4:Water management in the catchment area of the river.The gravel, the total cost of the project is estimated at PLN 63 353 221,66.The project uses natural or natural based methods.The way in which the rainwater is to be used in the pro...

18 February 2020

8 February 2020

31 January 2020

14 January 2020