Revision history of "Dehydration of the Kiedrzyn district in Częstochowa" (Q85041)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2206:22, 13 October 2024DG Regio talk contribs 68,425 bytes −19 Set a claim value: summary (P836): O objetivo do projeto é organizar a gestão da água no distrito de Kiedrzyn, em Częstochowa, e a sua gestão adequada. Âmbito O investimento inclui a construção de um coletor de chuva para condutas, um coletor de chuva aberto – uma vala, um reservatório de armazenamento e uma rota tecnológica. No âmbito do projeto, o coletor de chuva de tubos de betão armado será fechado. 1363 m., coletor aberto sob a forma de uma vala com um comprimento de 576,03 m,...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

13 August 2022

  • curprev 17:1817:18, 13 August 2022DG Regio talk contribs 63,203 bytes +39,308 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2316:23, 30 November 2021DG Regio talk contribs 14,861 bytes +2,279 Created claim: summary (P836): L’objectif du projet est d’organiser la gestion de l’eau dans le district de Kiedrzyn à Częstochowa et de la gérer en conséquence. L’investissement couvre la construction d’un collecteur tubulaire de pluie, d’un collecteur de pluie ouvert — un fossé, d’un réservoir absorbant de rétention par évaporation et d’une voie technologique. Dans le cadre du projet, un collecteur de pluie fermé à partir de tuyaux en béton armé d’une longueur d’env. 1 363 ...
  • curprev 16:2316:23, 30 November 2021DG Regio talk contribs 12,582 bytes +114 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 12,908 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 12,797 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 12,905 bytes +1,970 Created claim: summary (P836): The aim of the project is to organise water management in the Kiedrzyn district in Częstochowa and its proper management. Scope The investment includes the construction of a pipe rain manifold, an open rain manifold – a ditch, a storage tank and a technological route. Within the framework of the project, the rain collector from reinforced concrete pipes will be closed. 1363 m., open manifold in the form of a ditch with a length of 576.03 m, stor...
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 10,935 bytes −1,348 Removed claim: summary (P836): The aim of the project is to structure and manage the water management of the Kedzyn district in Częstochowa.The scope of the investment consists of the construction of a rainwater collector, an open rainwater collector, a ditch, a retention/evaporation basin and a technological path.As part of the project, a closed rainwater collector will be carried out from a length ca tube of ca.1 363 m., open collector in the form of a ditch of length 576...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 11,001 bytes +1,348 Created claim: summary (P836): The aim of the project is to structure and manage the water management of the Kedzyn district in Częstochowa.The scope of the investment consists of the construction of a rainwater collector, an open rainwater collector, a ditch, a retention/evaporation basin and a technological path.As part of the project, a closed rainwater collector will be carried out from a length ca tube of ca.1 363 m., open collector in the form of a ditch of length 576.0...

18 February 2020

8 February 2020

31 January 2020

14 January 2020