Revision history of "Restoration of ecological continuity and implementation of actions to improve the functioning of the White Tarnów river corridor of free migration" (Q85033)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 71,803 bytes −2 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 71,805 bytes +10 Set a claim value: summary (P836): O projeto abrange a execução de duas atividades de investimento: — Execução da reconstrução/desmantelamento de 15 anteparas hidrotécnicas para restabelecer a continuidade ecológica do rio Biała Tarnów e — Conceção e execução de projetos que estimulem o funcionamento do corredor de livre migração e a necessária segurança das infraestruturas na fronteira deste corredor. O projeto envolve a execução dos dois projetos seguintes: — iniciar processos de r...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3722:37, 2 March 2023DG Regio talk contribs 70,127 bytes −415 Changed label, description and/or aliases in da, it, sk, el, sv, bg, hu, de, fr, fi, ro, lv, ga, cs, et, pt, nl, es, lt, sl, mt, hr, and other parts

27 October 2022

26 October 2022

20 October 2022

26 July 2022

  • curprev 04:0104:01, 26 July 2022DG Regio talk contribs 67,223 bytes +42,365 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 15:3015:30, 30 November 2021DG Regio talk contribs 15,324 bytes +2,217 Created claim: summary (P836): Le projet couvre la mise en œuvre de deux activités d’investissement: — La reconstruction/déclassement de 15 divisions hydrotechniques afin de rétablir la continuité écologique de la rivière Biała Tarnowska et — Conception et mise en œuvre de projets stimulant le fonctionnement du corridor de migration libre et la sécurité nécessaire des infrastructures à la frontière de ce corridor. Le projet implique la mise en œuvre des deux projets suivants:...
  • curprev 15:3015:30, 30 November 2021DG Regio talk contribs 13,107 bytes +231 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 13,316 bytes +207 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 13,109 bytes −223 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 13,332 bytes +2,093 Created claim: summary (P836): The project covers the implementation of two investment activities: — Execution of reconstruction/decommissioning of 15 hydrotechnical bulkheads to restore ecological continuity of the Biała Tarnów river and – Design and execution of projects stimulating the functioning of the corridor of free migration and necessary security of infrastructure at the border of this corridor. The project involves the implementation of the following two projects:...
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 11,239 bytes −1,664 Removed claim: summary (P836): The project involves the implementation of two investment actions:— Completion of reconstruction/decommissioning of 15 hydrotechnical divisions in order to restore the ecological continuity of the River Tarnowska river and — Design and implement measures to stimulate the functioning of a free migration corridor and the necessary infrastructure safeguards at the border of the corridor.The project involves the following two projects:— initiating...

25 September 2020

23 September 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 11,626 bytes +1,664 Created claim: summary (P836): The project involves the implementation of two investment actions:— Completion of reconstruction/decommissioning of 15 hydrotechnical divisions in order to restore the ecological continuity of the River Tarnowska river and — Design and implement measures to stimulate the functioning of a free migration corridor and the necessary infrastructure safeguards at the border of the corridor.The project involves the following two projects:— initiating p...

18 February 2020

8 February 2020

31 January 2020

14 January 2020