Revision history of "Liquidation of group heat nodes in Łaziska Górny." (Q85015)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 45,587 bytes +1 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 45,586 bytes −1 Set a claim value: summary (P836): O projeto consiste na conversão de redes de aquecimento de canais com isolamento térmico degradado e danificadas pela corrosão com tubos de aquecimento numa rede de aquecimento sem canais a partir de tubos modernos pré-isolados e na construção de 29 permutadores de calor individuais de elevada eficiência. O projecto consiste em três tarefas.

7 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:2322:23, 2 March 2023DG Regio talk contribs 43,193 bytes +103 Changed label, description and/or aliases in da, it, sk, lt, bg, hr, et, ga, cs, fr, sv, lv, ro, el, fi, es, de, hu, mt, pt, sl, nl, and other parts

27 October 2022

26 October 2022

20 October 2022

26 July 2022

  • curprev 04:0004:00, 26 July 2022DG Regio talk contribs 40,970 bytes +23,854 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 15:2915:29, 30 November 2021DG Regio talk contribs 12,046 bytes +1,176 Created claim: summary (P836): Le projet consiste à reconstruire des réseaux de chauffage sans conduits avec isolation thermique dégradée et tuyaux de chauffage affectés par la corrosion en un réseau de chauffage sans conduits à partir de tuyaux pré-isolés modernes et la construction de 29 échangeurs de chaleur individuels à haut rendement. Le projet comporte trois tâches., translated_summary
  • curprev 15:2915:29, 30 November 2021DG Regio talk contribs 10,870 bytes +123 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 11,187 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 11,077 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 11,196 bytes +1,138 Created claim: summary (P836): The project consists of the conversion of channel heating networks with degraded thermal insulation and damaged by corrosion with heating pipes into a channelless heating network from modern pre-insulated pipes and the construction of 29 individual high-efficiency heat exchangers. The project consists of three tasks., translated_summary
  • curprev 14:5214:52, 14 October 2020DG Regio talk contribs 10,058 bytes −699 Removed claim: summary (P836): The project consists of reconverting district heating networks with thermal insulated heat and affected by the corrosion of district heating to a non-ducted district heating network from advanced pre-insulated pipes and the construction of 29 individual high efficiency heat exchanger units.The project consists of three tasks., remove_old_english_translation

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 9,470 bytes +699 Created claim: summary (P836): The project consists of reconverting district heating networks with thermal insulated heat and affected by the corrosion of district heating to a non-ducted district heating network from advanced pre-insulated pipes and the construction of 29 individual high efficiency heat exchanger units.The project consists of three tasks., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020