Revision history of "Reconstruction of thermal networks in Cieszyn with the construction of connections and district nodes to liquidate group nodes." (Q85005)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 55,473 bytes −15 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 55,488 bytes −20 Set a claim value: summary (P836): O projeto será executado através da substituição da rede de calor do canal por cortes térmicos subterrâneos pré-isolados, da construção de uma rede térmica pré-isolada em novos troços ou da substituição do isolamento térmico nos gasodutos existentes da rede térmica arejada pela manutenção e reparação necessárias da estrutura de aço e betão armado dos gasodutos. Como parte do projeto, será realizada a liquidação das câmaras de aquecimento do corte de...

7 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:5016:50, 2 March 2023DG Regio talk contribs 53,115 bytes +903 Changed label, description and/or aliases in lv, da, sk, lt, ro, sl, pt, fi, sv, fr, et, bg, cs, ga, el, mt, hu, nl, es, it, de, hr, and other parts

27 October 2022

26 October 2022

20 October 2022

13 August 2022

  • curprev 17:1817:18, 13 August 2022DG Regio talk contribs 50,103 bytes +30,298 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2616:26, 30 November 2021DG Regio talk contribs 13,230 bytes +1,509 Created claim: summary (P836): Le projet sera mis en œuvre en remplaçant le réseau de chaleur gainée par de la chaleur souterraine pré-isolée, en construisant un réseau thermique pré-isolé sur de nouveaux tronçons ou en remplaçant l’isolation thermique sur les canalisations existantes du réseau de chaleur souterraine ainsi que l’entretien et la réparation nécessaires des conduites en acier et en béton armé. Dans le cadre du projet, le déclassement des chambres de chauffage ur...
  • curprev 16:2616:26, 30 November 2021DG Regio talk contribs 11,721 bytes +211 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5114:51, 14 October 2020DG Regio talk contribs 11,950 bytes +187 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5114:51, 14 October 2020DG Regio talk contribs 11,763 bytes −205 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5114:51, 14 October 2020DG Regio talk contribs 11,968 bytes +1,430 Created claim: summary (P836): The project will be implemented through the replacement of the channel heat network with pre-insulated underground heat cuts, the construction of a pre-insulated thermal network on new sections or by replacing thermal insulation on existing aerated thermal network pipelines with the necessary maintenance and repair of the steel and reinforced concrete structure of pipelines. As part of the project, the liquidation of the heating chambers of the...
  • curprev 14:5114:51, 14 October 2020DG Regio talk contribs 10,538 bytes −917 Removed claim: summary (P836): The planned project will be implemented by the replacement of a heat network to preinsulated underground heat, the construction of a preinsulated heat network on new legs or through an exchange of thermal insulation on existing air heat networks pipelines, including the necessary maintenance and repair of the steel support steel and pipe structures.The project will result in the removal of district heating chambers.In addition, links will be b...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0410:04, 4 March 2020DG Regio talk contribs 10,175 bytes +917 Created claim: summary (P836): The planned project will be implemented by the replacement of a heat network to preinsulated underground heat, the construction of a preinsulated heat network on new legs or through an exchange of thermal insulation on existing air heat networks pipelines, including the necessary maintenance and repair of the steel support steel and pipe structures.The project will result in the removal of district heating chambers.In addition, links will be bui...

18 February 2020

8 February 2020

31 January 2020

14 January 2020