Revision history of "Construction of CHP plant in Minsk Mazowiecki" (Q84890)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:1717:17, 13 August 2022DG Regio talk contribs 50,438 bytes +30,542 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2416:24, 30 November 2021DG Regio talk contribs 13,244 bytes +1,584 Created claim: summary (P836): Ce projet concerne l’installation d’un système de cogénération au sein de la chaudière existante appartenant à PEC Sp. z o.o. à Minsk Mazowiecki. Suite à l’investissement, la chaufferie actuelle à Minsk Mazowiecki à ul. 1 PLM Varsovie 1 deviendra une centrale combinée de chaleur et d’électricité. Le projet suppose l’utilisation du gaz naturel comme combustible. L’électricité produite sera utilisée pour son propre usage et l’électricité excédenta...
  • curprev 16:2416:24, 30 November 2021DG Regio talk contribs 11,660 bytes +150 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 11,950 bytes +104 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 11,846 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 11,974 bytes +1,493 Created claim: summary (P836): This project is connected with the installation of the cogeneration system within the existing boiler room belonging to PEC Sp. z o. o. in Minsk Mazowiecki. As a result of the investment, the current boiler room operating in Minsk Mazowiecki on ul. 1 PLM Warszawa 1 will be transformed into a CHP plant. The project assumes the use of natural gas as fuel. The electricity produced will be used for own use and its excess will be sold to the Energy P...
  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 10,481 bytes −1,004 Removed claim: summary (P836): This project is linked to the installation of a cogeneration system within the existing boiler of PEC Sp. z o. o. in Minsk Mazowiecki.As a result of the investment, the current boiler in Minsk Mazowiecki at ul.1 PLM Warszawa 1 will be converted into a combined heat and power plant.The project assumes the use of natural gas as a fuel.The electricity produced will be used for own purposes and the surplus will be sold to the Energy Plant.The proj...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5509:55, 4 March 2020DG Regio talk contribs 10,196 bytes +1,004 Created claim: summary (P836): This project is linked to the installation of a cogeneration system within the existing boiler of PEC Sp. z o. o. in Minsk Mazowiecki.As a result of the investment, the current boiler in Minsk Mazowiecki at ul.1 PLM Warszawa 1 will be converted into a combined heat and power plant.The project assumes the use of natural gas as a fuel.The electricity produced will be used for own purposes and the surplus will be sold to the Energy Plant.The projec...

18 February 2020

8 February 2020

31 January 2020

14 January 2020