Revision history of "Construction of a new high-efficiency cogeneration unit with a power of 4,5 MWe" (Q84889)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 49,621 bytes +21 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 49,600 bytes −19 Set a claim value: summary (P836): Principais objectivos do projecto: «Construção de uma nova unidade de cogeração de elevada eficiência de 4,5 MWe»: 1. Assegurar a continuidade e a segurança da prestação de serviços de iluminação e preparação do ar pelo requerente em estufas de clientes existentes e recém-concebidas. Este objetivo será alcançado através do aumento da capacidade do candidato, graças à unidade de cogeração de elevada eficiência de 4,5 MWe construída no âmbito do proje...

23 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3622:36, 2 March 2023DG Regio talk contribs 47,225 bytes −154 Changed label, description and/or aliases in it, da, sk, et, de, hr, bg, fi, es, ga, lv, pt, sv, cs, hu, fr, nl, el, ro, lt, sl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 03:5803:58, 26 July 2022DG Regio talk contribs 45,275 bytes +26,694 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2416:24, 30 November 2021DG Regio talk contribs 12,562 bytes +1,362 Created claim: summary (P836): Les principaux objectifs du projet sont les suivants: «Construction d’une nouvelle unité de cogénération à haut rendement d’une capacité de 4,5 MWe»: 1. Assurer la continuité et la certitude de la fourniture par la requérante de services d’éclairage et de préparation de l’air dans les serres existantes et nouvellement conçues. Cet objectif sera atteint par l’expansion de la capacité de production du candidat, grâce à l’unité de cogénération à ha...
  • curprev 16:2416:24, 30 November 2021DG Regio talk contribs 11,200 bytes +161 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 11,479 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 11,341 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 11,482 bytes +1,258 Created claim: summary (P836): Main objectives of the project: ‘Construction of a new 4,5 MWe high-efficiency cogeneration unit’ means: 1. Ensure continuity and certainty of the provision of air lighting and preparation services by the Applicant in existing and newly designed customers’ greenhouses. This objective will be achieved by increasing the applicant’s capacity, thanks to the 4.5 MWe high-efficiency cogeneration unit built as part of the project. 2., translated_summary
  • curprev 14:4314:43, 14 October 2020DG Regio talk contribs 10,224 bytes −870 Removed claim: summary (P836): The main objectives of the project:‘Construction of a new unit for high efficiency cogeneration with a capacity of 4,5 MWe’ is as follows:1.To ensure continuity and certainty for the provision of lighting and air conditioning services by the Applicant in existing and newly designed customer greenhouses.This objective will be achieved by the distribution of the Applicant’s generation capacity built as part of the project of a high-efficiency co...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5509:55, 4 March 2020DG Regio talk contribs 9,803 bytes +870 Created claim: summary (P836): The main objectives of the project:‘Construction of a new unit for high efficiency cogeneration with a capacity of 4,5 MWe’ is as follows:1.To ensure continuity and certainty for the provision of lighting and air conditioning services by the Applicant in existing and newly designed customer greenhouses.This objective will be achieved by the distribution of the Applicant’s generation capacity built as part of the project of a high-efficiency coge...

18 February 2020

8 February 2020

31 January 2020

14 January 2020