Revision history of "Thermal modernisation of canal and overhead heat pipes in Gdynia, Rumi and the city of Wejherowo." (Q84851)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 52,276 bytes +10 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 52,266 bytes −65 Set a claim value: summary (P836): O projeto consiste na troca de isolamento em tubos de calor dispostos em canais de aquecimento, com diâmetros que variam de 2DN 100 a 2DN 600 e a troca de instalações térmicas por tecnologias de pré-isolamento. No caso dos aquecedores aéreos, apenas o isolamento será substituído. O projeto realizará 13 tarefas de investimento, incluindo 3 relativas ao aquecimento urbano e 10 redes. No total, 4 câmaras de aquecimento e cerca de 6 169 metros de rede.

23 March 2024

15 January 2024

14 June 2023

24 May 2023

2 March 2023

  • curprev 22:3622:36, 2 March 2023DG Regio talk contribs 49,937 bytes +1,435 Changed label, description and/or aliases in da, sk, it, fi, bg, fr, de, cs, pt, et, lv, ro, ga, sl, es, sv, hu, el, lt, mt, nl, hr, and other parts

27 October 2022

26 October 2022

19 October 2022

13 August 2022

  • curprev 17:1717:17, 13 August 2022DG Regio talk contribs 45,188 bytes +26,675 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1416:14, 30 November 2021DG Regio talk contribs 12,660 bytes +1,364 Created claim: summary (P836): Le projet consiste à remplacer l’isolation sur des tensions thermiques disposées dans des conduits de chauffage, avec des diamètres allant de 2DN 100 à 2DN 600, et à remplacer les canalisations thermiques par des technologies pré-isolées. Dans le cas des canalisations thermiques aériennes, seule l’isolation sera remplacée. Le projet réalisera 13 projets d’investissement, dont 3 pour les unités de chauffage urbain et 10 pour les réseaux. Au total...
  • curprev 16:1416:14, 30 November 2021DG Regio talk contribs 11,296 bytes +168 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4014:40, 14 October 2020DG Regio talk contribs 11,568 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4014:40, 14 October 2020DG Regio talk contribs 11,412 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4014:40, 14 October 2020DG Regio talk contribs 11,552 bytes +1,248 Created claim: summary (P836): The project consists of exchanging insulation on heat pipes arranged in heating channels, with diameters ranging from 2DN 100 to 2DN 600 and the exchange of heatworks for pre-insulated technologies. In the case of overhead heaters, only insulation will be replaced. The project will carry out 13 investment tasks, including 3 concerning district heating and 10 networks. In total, 4 heating chambers and ca. 6 169 meters of net., translated_summary
  • curprev 14:4014:40, 14 October 2020DG Regio talk contribs 10,304 bytes −860 Removed claim: summary (P836): The project consists of an exchange of insulation on the heat pipes arranged in the district heating ducts, with diameters of 2dn 100 to 2dn 600, and hot water exchanges on pre-insulated technologies.In the case of warm air pipes, only the insulation shall be replaced.The project will carry out 13 investment tasks, including 3 on district heating and 10 on networks.In total, 4 district heating and around district heating will be modernised as...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5509:55, 4 March 2020DG Regio talk contribs 9,881 bytes +860 Created claim: summary (P836): The project consists of an exchange of insulation on the heat pipes arranged in the district heating ducts, with diameters of 2dn 100 to 2dn 600, and hot water exchanges on pre-insulated technologies.In the case of warm air pipes, only the insulation shall be replaced.The project will carry out 13 investment tasks, including 3 on district heating and 10 on networks.In total, 4 district heating and around district heating will be modernised as pa...

18 February 2020

8 February 2020

31 January 2020

14 January 2020