Revision history of "Construction of power stations on the premises of PCC Rokita S.A. sewage treatment plant" (Q84775)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 59,698 bytes +10 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 59,688 bytes +127 Set a claim value: summary (P836): Projeto BC: A construção de centrais elétricas nas instalações da estação de tratamento de águas residuais PCC Rokita S.A. diz respeito à construção de centrais elétricas inteligentes W-24, W-4, W-38. As estações serão equipadas com dispositivos de controlo remoto baseados no software SCADA e automação de proteção de energia interativa, incluindo indicadores de fluxo de corrente de curto-circuito baseados no modelo CIM da rede SN. As estações também...

23 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3622:36, 2 March 2023DG Regio talk contribs 57,167 bytes −2,068 Changed label, description and/or aliases in lv, it, sk, da, fi, el, fr, bg, et, sl, pt, ga, hu, ro, hr, es, sv, nl, cs, lt, mt, de, and other parts

27 October 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:5503:55, 26 July 2022DG Regio talk contribs 57,124 bytes +35,597 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 13,938 bytes +1,769 Created claim: summary (P836): Projet intitulé: La construction de centrales électriques sur le site de la station d’épuration des eaux usées PCC Rokita S.A. concerne la construction de centrales électriques intelligentes W-24, W-4, W-38. Les stations seront équipées de dispositifs de contrôle à distance basés sur le logiciel SCADA et d’automatisation interactive de protection de l’énergie, y compris des débits de courant de court-circuit basés sur le modèle CIM du réseau SN....
  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 12,169 bytes +158 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 12,451 bytes +147 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 12,304 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 12,421 bytes +1,700 Created claim: summary (P836): Project BC: Construction of power stations on the premises of PCC Rokita S.A. sewage treatment plant, concerns the construction of intelligent power stations W-24, W-4, W-38. The stations will be equipped with remote control devices based on SCADA software and interactive power protection automation, including short-circuit current flow indicators based on the CIM model of the SN network. The stations will also use smart metering, including bala...
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 10,721 bytes −1,250 Removed claim: summary (P836): The project entitled:The construction of the electricity stations at the PCC Roikita S.A. WWTP relates to the construction of smart electric stations W-24, W-4, W-38.The stations will be equipped with remote controls based on the SCADA software and an interactive electrical protection system, including the short-circuit current flow rates based on the CIM SN model.In stations, smart meters will also be used, including balancing meters with the...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4809:48, 4 March 2020DG Regio talk contribs 10,683 bytes +1,250 Created claim: summary (P836): The project entitled:The construction of the electricity stations at the PCC Roikita S.A. WWTP relates to the construction of smart electric stations W-24, W-4, W-38.The stations will be equipped with remote controls based on the SCADA software and an interactive electrical protection system, including the short-circuit current flow rates based on the CIM SN model.In stations, smart meters will also be used, including balancing meters with the C...

18 February 2020

8 February 2020

31 January 2020

14 January 2020