Revision history of "Construction of an intelligent power station 6/0, 4 kV at PCC Rokita S.A. (D-0)" (Q84774)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 51,140 bytes −19 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 51,159 bytes −2 Set a claim value: summary (P836): O projeto diz respeito à construção de uma central elétrica de 6/0, 4 kV equipada com dispositivos de controlo remoto baseados no software SCADA, automatização interativa da segurança elétrica, sistema DSC para monitorizar os processos de produção. O objetivo do projeto é melhorar a utilização eficiente da eletricidade, garantir a segurança do fornecimento de eletricidade às unidades PCC Rokita e reduzir as perdas de energia através da modernização...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:2422:24, 2 March 2023DG Regio talk contribs 48,768 bytes +364 Changed label, description and/or aliases in da, it, sk, hr, fi, ro, lv, sl, pt, et, sv, ga, el, es, hu, nl, cs, fr, lt, mt, de, bg, and other parts

27 October 2022

26 October 2022

19 October 2022

13 August 2022

  • curprev 17:1617:16, 13 August 2022DG Regio talk contribs 46,294 bytes +27,543 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 12,696 bytes +1,436 Created claim: summary (P836): Le projet porte sur la construction d’une centrale électrique de 6/0, 4 kV équipée de dispositifs de télécommande basés sur le logiciel SCADA, d’automatisation interactive de sécurité électrique, d’un système DSC pour la supervision des processus de production. L’objectif du projet est d’améliorer l’utilisation efficace de l’électricité, d’assurer la sécurité de l’approvisionnement en électricité des unités de PCC Rokita et de réduire les pertes...
  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 11,260 bytes +150 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 11,550 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 11,412 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 11,552 bytes +1,288 Created claim: summary (P836): The project concerns the construction of a power station 6/0, 4 kV equipped with remote control devices based on SCADA software, interactive electrical security automation, DSC system for monitoring production processes. The aim of the project is to improve the efficient use of electricity, ensure security of electricity supply to PCC Rokita units and reduce energy losses through modernisation of the above-mentioned stations and implementation o...
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 10,264 bytes −852 Removed claim: summary (P836): The project concerns the construction of a 6/0, 4 kV station equipped with remote control devices based on the SCADA software, an interactive electrical protection machine, a DSC system for the supervision of production processes.The aim of the project is to improve the efficient use of electricity, to ensure the security of supply of electricity to the unit of PCC Rokita and to reduce energy transmission losses by upgrading the station and im...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4809:48, 4 March 2020DG Regio talk contribs 9,837 bytes +852 Created claim: summary (P836): The project concerns the construction of a 6/0, 4 kV station equipped with remote control devices based on the SCADA software, an interactive electrical protection machine, a DSC system for the supervision of production processes.The aim of the project is to improve the efficient use of electricity, to ensure the security of supply of electricity to the unit of PCC Rokita and to reduce energy transmission losses by upgrading the station and impl...

18 February 2020

8 February 2020

31 January 2020

14 January 2020