Revision history of "Intelligent network construction in northern Wielkopolska (OD Poznań North) through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of remote control and power protection automation, inclu" (Q84766)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 64,714 bytes −22 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 64,736 bytes −22 Set a claim value: summary (P836): O objetivo direto do projeto é assegurar um sistema energético eficiente e económica e tecnicamente sustentável, com baixas perdas e um elevado nível de qualidade e segurança do aprovisionamento e da segurança. O objetivo direto e, por conseguinte, o projeto, está em consonância com os objetivos do programa operacional, o eixo prioritário e as ações e submedidas. A construção de uma rede de transporte inteligente nos municípios de Złotów, Zakrzewo,...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3622:36, 2 March 2023DG Regio talk contribs 62,364 bytes +388 Changed label, description and/or aliases in lv, it, da, sk, ro, fi, es, ga, pt, lt, hr, fr, el, sv, et, nl, hu, sl, cs, bg, de, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:5503:55, 26 July 2022DG Regio talk contribs 59,890 bytes +37,215 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 14,402 bytes +1,710 Created claim: summary (P836): L’objectif direct du projet est de garantir un système énergétique efficace et économiquement et techniquement durable, avec de faibles pertes et un niveau élevé de qualité et de sécurité d’approvisionnement et de sécurité. L’objectif direct et donc le projet sont conformes aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et des sous-mesures. La construction d’un réseau de transport intelligent dans les municipalités...
  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 12,692 bytes +464 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 12,668 bytes +357 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 12,311 bytes −363 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 12,674 bytes +1,647 Created claim: summary (P836): The direct objective of the project is to ensure an efficient and economically and technically sustainable energy system with low losses and a high level of quality and security of supply and security. The direct objective, and thus the project, is in line with the objectives of the Operational Programme, the priority axis and the actions and sub-measures. The construction of an intelligent transmission network in the communes of Złotów, Zakrzew...
  • curprev 14:3814:38, 14 October 2020DG Regio talk contribs 11,027 bytes −1,152 Removed claim: summary (P836): The direct objective of the project is to ensure an efficient, economically and technically sustainable energy system with low losses and a high level of quality and security of supply and protection.The direct objective and therefore the project are in line with the objectives of the Operational Programme, the priority axis and the actions and sub-actions.The construction of a smart transmission network in the municipalities of Złotów, Zakrze...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4809:48, 4 March 2020DG Regio talk contribs 10,890 bytes +1,152 Created claim: summary (P836): The direct objective of the project is to ensure an efficient, economically and technically sustainable energy system with low losses and a high level of quality and security of supply and protection.The direct objective and therefore the project are in line with the objectives of the Operational Programme, the priority axis and the actions and sub-actions.The construction of a smart transmission network in the municipalities of Złotów, Zakrzewo...

18 February 2020

8 February 2020

31 January 2020

14 January 2020