Revision history of "The construction of an intelligent network in central Wielkopolska (OD Poznań Price) through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of remote control and power protection automati" (Q84764)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:3823:38, 2 March 2023DG Regio talk contribs 93,581 bytes −193 Changed label, description and/or aliases in bg, cs, da, de, el, es, et, fi, fr, ga, hr, hu, it, lt, lv, mt, nl, pt, ro, sk, sl, sv, and other parts

27 October 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:5503:55, 26 July 2022DG Regio talk contribs 84,385 bytes +54,692 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 17,382 bytes +2,772 Created claim: summary (P836): L’objectif direct du projet est de garantir un système énergétique efficace et économiquement et techniquement durable, avec de faibles pertes et un niveau élevé de qualité et de sécurité d’approvisionnement et de sécurité. L’objectif direct et donc le projet sont conformes aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et des sous-mesures. La construction d’un réseau électrique intelligent dans les communes de Swar...
  • curprev 16:1716:17, 30 November 2021DG Regio talk contribs 14,610 bytes +437 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:2015:20, 14 October 2020DG Regio talk contribs 14,613 bytes +367 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2015:20, 14 October 2020DG Regio talk contribs 14,246 bytes −391 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2015:20, 14 October 2020DG Regio talk contribs 14,637 bytes +2,596 Created claim: summary (P836): The direct objective of the project is to ensure an efficient and economically and technically sustainable energy system with low losses and a high level of quality and security of supply and security. The direct objective, and thus the project, is in line with the objectives of the Operational Programme, the priority axis and the actions and sub-measures. The construction of an intelligent power grid in the communes of Swarzędz, Kostrzyn, Suchy...
  • curprev 15:2015:20, 14 October 2020DG Regio talk contribs 12,041 bytes −2,100 Removed claim: summary (P836): The direct objective of the project is to ensure an efficient and technically sustainable energy system with low losses and a high level of quality and security of supply and protection.The direct objective and therefore the project are in line with the objectives of the Operational Programme, the priority axis and the actions and sub-actions.The construction of a smart electricity grid in the municipalities of Swarzędz, Kostrzyn, Suchy Las, S...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4809:48, 4 March 2020DG Regio talk contribs 12,859 bytes +2,100 Created claim: summary (P836): The direct objective of the project is to ensure an efficient and technically sustainable energy system with low losses and a high level of quality and security of supply and protection.The direct objective and therefore the project are in line with the objectives of the Operational Programme, the priority axis and the actions and sub-actions.The construction of a smart electricity grid in the municipalities of Swarzędz, Kostrzyn, Suchy Las, Sza...

18 February 2020

8 February 2020

31 January 2020

14 January 2020