Revision history of "Deep modernisation of the office building in Gorzów Wlkp. on ul. Kazimierz Wielki 65, 66-400 Gorzów Wlkp." (Q84659)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 56,761 bytes +13 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 56,748 bytes +1 Set a claim value: summary (P836): Modernização global do edifício de utilidade pública situado em Gorzów Wielkopolski, em ul. Kazimierz Wielki 65, dedicado à atividade estatutária do Serviço Aduaneiro e do Tesouro de Lubuski em Gorzów Wielkopolski. O edifício de base não é adegado, ligado à secção de conferências através da ligação do conector. O objetivo do projeto é melhorar as perdas de energia através de: — isolamento das paredes — edifício alto — aquecimento das paredes — edifí...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:4918:49, 2 March 2023DG Regio talk contribs 54,353 bytes −749 Changed label, description and/or aliases in lv, it, da, sk, cs, fi, el, ro, fr, pt, sv, sl, de, ga, lt, hr, mt, es, hu, bg, nl, et, and other parts

27 October 2022

26 October 2022

19 October 2022

13 August 2022

  • curprev 17:1517:15, 13 August 2022DG Regio talk contribs 52,992 bytes +32,476 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1516:15, 30 November 2021DG Regio talk contribs 13,445 bytes +1,616 Created claim: summary (P836): Modernisation complète d’un bâtiment public situé à Gorzów Wielkopolski à ul. Kazimierz Wielki 65, dédié aux activités statutaires du bureau des douanes et des impôts de Lubuskie à Gorzów Wielkopolski. Bâtiment de base sans sous-sol, relié à la partie conférence par connexion. L’objectif du projet est d’améliorer la réduction des pertes d’énergie en: — isolation des murs — haut bâtiment — isolation des murs — bâtiment faible — réchauffement des...
  • curprev 16:1516:15, 30 November 2021DG Regio talk contribs 11,829 bytes +172 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0915:09, 14 October 2020DG Regio talk contribs 12,097 bytes +167 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0915:09, 14 October 2020DG Regio talk contribs 11,930 bytes −171 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0915:09, 14 October 2020DG Regio talk contribs 12,101 bytes +1,541 Created claim: summary (P836): Comprehensive modernisation of the public utility building located in Gorzów Wielkopolski on ul. Kazimierz Wielki 65, dedicated to the statutory activity of the Lubuski Customs and Treasury Office in Gorzów Wielkopolski. The basic building is not cellared, connected to the conference section by connecting the connector. The aim of the project is to improve energy losses by: — insulation of walls – high building – warming of walls – low building...
  • curprev 15:0915:09, 14 October 2020DG Regio talk contribs 10,560 bytes −1,107 Removed claim: summary (P836): Comprehensive modernisation of the public building located in Gorzów Wielkopolski, ul.Kazimierz Grand 65 for the statutory activities of the Lubuskie Customs and Revenue Office in Gorzów Wielkopolski.The main building, which is not ‘podpiwek’, together with the conference section.The project is an improvement aimed at reducing energy losses by:— insulation of the walls — high building — insulation of walls — low building — insulation of the wa...

25 September 2020

23 September 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:4609:46, 4 March 2020DG Regio talk contribs 10,379 bytes +1,107 Created claim: summary (P836): Comprehensive modernisation of the public building located in Gorzów Wielkopolski, ul.Kazimierz Grand 65 for the statutory activities of the Lubuskie Customs and Revenue Office in Gorzów Wielkopolski.The main building, which is not ‘podpiwek’, together with the conference section.The project is an improvement aimed at reducing energy losses by:— insulation of the walls — high building — insulation of walls — low building — insulation of the wall...

18 February 2020

8 February 2020

31 January 2020

14 January 2020