Revision history of "Thermal modernisation of the facility of the Regional Police Headquarters in Gorzów Wielkopolski at ul. Batory 90 in Zielona Góra" (Q84583)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 59,136 bytes +16 Changed label, description and/or aliases in pt
  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 59,120 bytes +27 Set a claim value: summary (P836): O projeto será executado na voivodia de Lubuskie, na cidade de Zielona Góra. As obras termomodernas incluirão o edifício KWP, situado na rua Batorego 90 – parcela 99/3. O objetivo do projeto a nível do produto é melhorar o isolamento térmico da instalação de utilidade pública em Zielona Góra. Os objetivos a nível dos resultados diretos e a longo prazo incluem: — adaptação do edifício de utilidade pública às normas térmicas aplicáveis, — minimização...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3622:36, 2 March 2023DG Regio talk contribs 56,699 bytes −690 Changed label, description and/or aliases in da, it, sk, es, lv, ga, el, fr, bg, fi, sl, de, sv, et, pt, ro, lt, hu, nl, cs, hr, mt, and other parts

26 October 2022

19 October 2022

13 August 2022

  • curprev 17:1417:14, 13 August 2022DG Regio talk contribs 55,287 bytes +34,057 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 13,745 bytes +1,700 Created claim: summary (P836): Le projet sera mis en œuvre dans la voïvodie de Lubuskie, dans la ville de Zielona Góra. Les travaux thermomodernes seront couverts par le bâtiment KWP, situé sur la rue Batorego 90 — parcelle 99/3. L’objectif du projet au niveau des produits est d’améliorer l’isolation thermique d’une installation d’utilité publique à Zielona Góra. Parmi les objectifs au niveau des résultats directs et à long terme figurent: — adapter le bâtiment d’utilité publ...
  • curprev 20:5620:56, 30 November 2021DG Regio talk contribs 12,045 bytes +206 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:0715:07, 14 October 2020DG Regio talk contribs 12,279 bytes +191 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:0715:07, 14 October 2020DG Regio talk contribs 12,088 bytes −173 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:0715:07, 14 October 2020DG Regio talk contribs 12,261 bytes +1,614 Created claim: summary (P836): The project will be implemented in Lubuskie Voivodeship, in the city of Zielona Góra. The thermomodern works will include the KWP building, located on Batorego Street 90 – plot 99/3. The aim of the project at product level is to improve the thermal insulation of the public utility facility in Zielona Góra. The objectives at the level of direct and long-term results include: — adaptation of the public utility building to the applicable thermal st...
  • curprev 15:0715:07, 14 October 2020DG Regio talk contribs 10,647 bytes −1,146 Removed claim: summary (P836): The project will be carried out in Lubuskie Province, Zielona Góra.The KWP Building, located at Batoe Street 90 — plot 99/3, will be covered by the work of the thermocouple.The objective of the project at product level is to improve the thermal insulation of a public utility in Zielona Góra.Among the objectives at the level of direct and long-term results, the following are assumed:— to adapt the public building to the applicable thermal stand...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3509:35, 4 March 2020DG Regio talk contribs 10,511 bytes +1,146 Created claim: summary (P836): The project will be carried out in Lubuskie Province, Zielona Góra.The KWP Building, located at Batoe Street 90 — plot 99/3, will be covered by the work of the thermocouple.The objective of the project at product level is to improve the thermal insulation of a public utility in Zielona Góra.Among the objectives at the level of direct and long-term results, the following are assumed:— to adapt the public building to the applicable thermal standar...

18 February 2020

8 February 2020

31 January 2020

14 January 2020