Revision history of "Improving the energy efficiency of the buildings of the Criminal Facility in Krzywaniec" (Q84562)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 78,575 bytes −6 Changed label, description and/or aliases in pt
  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 78,581 bytes +9 Set a claim value: summary (P836): O projeto consistirá na termomodernização de 15 edifícios do mecanismo penal em Cursaniec com a utilização de FER, o que conduzirá a uma redução da energia final de, pelo menos, 25 %. As obras de modernização térmica consistirão na substituição de duas caldeiras a gasóleo, que necessitam de ser substituídas devido ao nível de funcionamento e a parâmetros desfavoráveis, para duas caldeiras de condensação a funcionar em cascata, com uma capacidade de...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3622:36, 2 March 2023DG Regio talk contribs 77,680 bytes −111 Changed label, description and/or aliases in da, it, sk, es, lv, ga, el, fr, fi, bg, et, sv, sl, de, pt, ro, lt, cs, hu, hr, nl, mt, and other parts

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:5003:50, 26 July 2022DG Regio talk contribs 75,678 bytes +48,579 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 16,272 bytes +2,724 Created claim: summary (P836): Le projet consistera en une thermomodernisation de 15 bâtiments de l’usine Karny à Krzywaiec ainsi qu’à l’utilisation des SER, ce qui entraînera une réduction de l’énergie finale d’au moins 25 %. Les travaux de thermomodernisation consisteront en le remplacement de deux chaudières à gaz, qui devront être remplacées en raison du degré de fonctionnement et de paramètres défavorables, en deux chaudières à condensation, fonctionnant en cascade, d’un...
  • curprev 20:5720:57, 30 November 2021DG Regio talk contribs 13,548 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 13:1013:10, 14 October 2020DG Regio talk contribs 13,836 bytes +146 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:1013:10, 14 October 2020DG Regio talk contribs 13,690 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:1013:10, 14 October 2020DG Regio talk contribs 13,818 bytes +2,412 Created claim: summary (P836): The project will consist of the thermomodernisation of 15 buildings of the Criminal Facility in Cursaniec with the use of RES, which will lead to a reduction of final energy by at least 25 %. The thermal modernisation works will consist of the replacement of two gas-oil boilers, which require replacement due to the level of operation and unfavourable parameters, for two condensation boilers operating in a cascade, with a capacity of 500 kW each...
  • curprev 13:1013:10, 14 October 2020DG Regio talk contribs 11,406 bytes −1,945 Removed claim: summary (P836): The project will consist of the thermo-modernisation of the 15 buildings of the branch of the Krzywo-branch office with the use of RES, which will lead to a reduction of at least 25 % in final energy.The thermal modernisation work will consist of the replacement of two gas oil boilers that require an exchange due to the type of operation and unfavourable parameters, for two condensing boilers, operating in the cascade, with a power of 500 kW e...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3509:35, 4 March 2020DG Regio talk contribs 12,065 bytes +1,945 Created claim: summary (P836): The project will consist of the thermo-modernisation of the 15 buildings of the branch of the Krzywo-branch office with the use of RES, which will lead to a reduction of at least 25 % in final energy.The thermal modernisation work will consist of the replacement of two gas oil boilers that require an exchange due to the type of operation and unfavourable parameters, for two condensing boilers, operating in the cascade, with a power of 500 kW eac...

18 February 2020

8 February 2020

31 January 2020

14 January 2020