Revision history of "Thermomodernisation of objects of the Voivodeship Police Headquarters in Lublin" (Q84535)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 48,563 bytes −5 Changed label, description and/or aliases in pt
  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 48,568 bytes −1 Set a claim value: summary (P836): Modernização térmica de 4 edifícios com uma área total utilizável de 12167,10 m2 (incluindo: Edifício principal ABCD – 11185,70 m2, Edifício G – 595,10 m2, Edifício H – 161,5 m2 e Carpintaria, serralheiro e garagem – 224,8 m2, juntamente com a modernização do sistema de aquecimento central, modernização/intercâmbio de fontes de calor, troca de iluminação por eficiência energética, instalação de bombas de calor e coletores solares.

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3622:36, 2 March 2023DG Regio talk contribs 46,175 bytes −258 Changed label, description and/or aliases in da, it, sk, lv, hr, ro, cs, ga, sv, et, mt, fi, de, bg, el, fr, lt, nl, es, pt, hu, sl, and other parts

2 December 2022

26 October 2022

19 October 2022

13 August 2022

  • curprev 17:1417:14, 13 August 2022DG Regio talk contribs 44,751 bytes +26,240 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 12,793 bytes +1,308 Created claim: summary (P836): Thermomodernisation de 4 bâtiments d’une superficie totale utilisable de 12 167,10 m² (y compris: Bâtiment principal ABCD — 11 185,70 m², bâtiment G — 595,10 m², bâtiment H — 161,5 m² et menuiserie, serrurier et garage — 224,8 m² avec modernisation des installations de chauffage central, modernisation/remplacement de la source de chaleur, remplacement de l’éclairage pour économie d’énergie, installation de pompes à chaleur et de capteurs solaire...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 11,485 bytes +146 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 11,366 bytes +138 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 11,228 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 11,354 bytes +1,238 Created claim: summary (P836): Thermal modernisation of 4 buildings with a total usable area of 12167,10 m² (including: Main building ABCD – 11185,70 m², Building G – 595.10 m², Building H – 161.5 m² and Carpentry, locksmith and garage – 224.8 m²) together with modernisation of the central heating system, modernisation/exchange of heat source, exchange of lighting for energy efficient, installation of heat pump and solar collectors., translated_summary
  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 10,116 bytes −810 Removed claim: summary (P836): Thermo-modernisation of 4 buildings with a total useful floor area of 12 167.10 m² (including:The main building ABCD — 11 185.70 m², Building G — 595.10 m², Building H — 161.5 m², Building, locksmith and garage — 224.8 m²) together with modernisation of the heating system, modernisation/replacement of the heat generator, replacement of lighting with energy efficient, installation of heat pumps and solar collectors., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3509:35, 4 March 2020DG Regio talk contribs 9,640 bytes +810 Created claim: summary (P836): Thermo-modernisation of 4 buildings with a total useful floor area of 12 167.10 m² (including:The main building ABCD — 11 185.70 m², Building G — 595.10 m², Building H — 161.5 m², Building, locksmith and garage — 224.8 m²) together with modernisation of the heating system, modernisation/replacement of the heat generator, replacement of lighting with energy efficient, installation of heat pumps and solar collectors., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020