Revision history of "Thermal modernisation of the WIOŚ Delegation building in Radom" (Q84515)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 88,824 bytes +4 Changed label, description and/or aliases in pt
  • curprev 06:2006:20, 13 October 2024DG Regio talk contribs 88,820 bytes −85 Set a claim value: summary (P836): O projeto «Termomodernização da Delegação WIOŚ em Radom» envolve uma profunda modernização térmica do edifício localizado na rua 9A Pułaskiego, em Radom. Os números das parcelas de registo são os seguintes: 13/7, 14,7 e 98/20 com uma área total de 4457 m2. O edifício foi construído em 1993. O edifício da Delegação WIOŚ é um edifício de utilidade pública. O estado técnico atual do edifício pode ser descrito como mau. O edifício é ineficiente em termo...

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 19:2219:22, 2 March 2023DG Regio talk contribs 86,511 bytes +621 Changed label, description and/or aliases in lv, it, sk, da, fi, de, sv, fr, bg, sl, et, ga, pt, ro, cs, hu, es, nl, hr, mt, lt, el, and other parts

2 December 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:4903:49, 26 July 2022DG Regio talk contribs 84,206 bytes +54,193 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 17,666 bytes +3,067 Created claim: summary (P836): Le projet «Termomodernisation du bâtiment de la délégation WIOŚ à Radom» implique une thermomodernisation profonde du bâtiment situé au 9A rue Pułaskiego à Radom. Les numéros des parcelles cadastrales sont les suivants: 13/7, 14,7 et 98/20 d’une superficie totale de 4 457 m². Le bâtiment a été construit en 1993. Le bâtiment de la délégation WiOŚ est un bâtiment d’utilité publique. L’état technique actuel du bâtiment peut être qualifié de mauvais...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 14,599 bytes +125 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 14,501 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 14,379 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 14,498 bytes +2,757 Created claim: summary (P836): The project “Termomodernisation of the WIOŚ Delegation in Radom” involves a deep thermal modernisation of the building located at 9A Pułaskiego Street in Radom. The numbers of the registration plots are: 13/7, 14,7 and 98/20 with a total area of 4457 m². The building was built in 1993. The building of the WIOŚ Delegation is a public utility building. The current technical condition of the building can be described as bad. The building is energy-...
  • curprev 13:0913:09, 14 October 2020DG Regio talk contribs 11,741 bytes −2,296 Removed claim: summary (P836): The project “Thermal Modernisation of the WIOŚ building in Radom” implies a deep renovation of the building located at the Pułanski 9A street in Radom.The numbers of the cadastre parcel (s) are:13/7, 14,7 and 98/20, with a total area of 4 457 m².The plant was built in 1993.The WIOŚ building is a public building.The current technical state of the building can be identified as poor.The building is energy inefficient.High losses of heat and energ...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3409:34, 4 March 2020DG Regio talk contribs 12,744 bytes +2,296 Created claim: summary (P836): The project “Thermal Modernisation of the WIOŚ building in Radom” implies a deep renovation of the building located at the Pułanski 9A street in Radom.The numbers of the cadastre parcel (s) are:13/7, 14,7 and 98/20, with a total area of 4 457 m².The plant was built in 1993.The WIOŚ building is a public building.The current technical state of the building can be identified as poor.The building is energy inefficient.High losses of heat and energy...

18 February 2020

8 February 2020

31 January 2020

14 January 2020