Revision history of "Improving the energy efficiency of selected WAT buildings" (Q84464)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 54,492 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 54,493 bytes −56 Set a claim value: summary (P836): O projeto previsto (Projeto) está localizado em Varsóvia e inclui a reconstrução de 3 edifícios WAT existentes com as seguintes características: • Edifício n.o 14 – ano de construção 1980, aprox. 12860 m3, número de andares acima do solo, número de andares subterrâneos 1. Objetivo do edifício – formação. • Edifício n.o 57 – ano de construção 1930, cerca de 11300 m3, número de andares acima do solo 2, número de andares subterrâneos 1. Finalidade do e...

7 March 2024

15 January 2024

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

2 December 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:4703:47, 26 July 2022DG Regio talk contribs 50,834 bytes +30,598 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 13,619 bytes +1,568 Created claim: summary (P836): Le projet prévu (projet) est situé à Varsovie et comprend la reconstruction de 3 bâtiments existants appartenant à WAT avec les caractéristiques suivantes: • Bâtiment no 14 — année de construction 1980, incubation env. 12 860 m³, nombre d’étages hors-sol 3, nombre d’étages souterrains 1. L’objectif du bâtiment — formation. • Bâtiment no 57 — année de construction 1930, incubation env. 11 300 m³, nombre d’étages hors-sol 2, nombre d’étages souter...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 12,051 bytes +139 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0313:03, 14 October 2020DG Regio talk contribs 11,939 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 11,823 bytes −115 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 11,938 bytes +1,516 Created claim: summary (P836): The planned project (Project) is located in Warsaw and includes the reconstruction of 3 existing WAT buildings with the following characteristics: • Building No 14 – construction year 1980, cubature approx. 12860 m³, number of above-ground floors 3, number of underground floors 1. Purpose of the building – training. • Building No 57 – construction year 1930, cubature approx. 11300 m³, number of above-ground floors 2, number of underground floors...
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 10,422 bytes −1,023 Removed claim: summary (P836): The planned project (project) is located in Warsaw and involves the upgrading of the existing 3 WAT buildings with the following characteristics:• Building No 14 — year of construction 1980, volume approx.12 860 m³, number of above-ground level 3, amount of floor level 1.Building destination — training.• Building No 57 — year of construction 1930, volume approx.11 300 m³, number of above-ground level 2, amount of floor level 1.Use of the build...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3909:39, 4 March 2020DG Regio talk contribs 10,165 bytes +1,023 Created claim: summary (P836): The planned project (project) is located in Warsaw and involves the upgrading of the existing 3 WAT buildings with the following characteristics:• Building No 14 — year of construction 1980, volume approx.12 860 m³, number of above-ground level 3, amount of floor level 1.Building destination — training.• Building No 57 — year of construction 1930, volume approx.11 300 m³, number of above-ground level 2, amount of floor level 1.Use of the buildin...

18 February 2020

8 February 2020

31 January 2020

14 January 2020