Revision history of "Reconstruction of the power supply system 110/6k V marked as E1 (d. 1/86) and E2 (c.1/26) to attach a 11.8 MW RES energy unit" (Q84421)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:1906:19, 13 October 2024DG Regio talk contribs 47,802 bytes −33 Changed label, description and/or aliases in pt
  • curprev 06:1906:19, 13 October 2024DG Regio talk contribs 47,835 bytes +6 Set a claim value: summary (P836): O projeto envolve a reconstrução do sistema de alimentação elétrica da central elétrica de 110/6 kV designado E1 e E2, a fim de ligar uma unidade de energia FER de 11,8 MW: — E-1 – ul. Ślusarska 5, Lublin (parte do terreno n.o 1/86 r. 13 Hajd), – E-2 -ul. Construtores 6 em Lublin (parte do terreno n.o 1/26 r. 13 Hajds).

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3522:35, 2 March 2023DG Regio talk contribs 45,435 bytes −88 Changed label, description and/or aliases in da, it, sk, lv, hr, fi, el, fr, ga, sv, et, pt, es, ro, hu, lt, de, nl, bg, sl, cs, mt, and other parts

2 December 2022

25 October 2022

19 October 2022

13 August 2022

  • curprev 17:1317:13, 13 August 2022DG Regio talk contribs 43,841 bytes +25,667 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 12,676 bytes +1,122 Created claim: summary (P836): Le projet comprend la reconstruction du système d’alimentation pour les centrales 110/6 kV marquées comme E1 et E2 afin de raccorder une unité SER de 11,8 MW: — E-1 — m. Ślusarska 5, Lublin (terrain no 1/86 r. 13 Haids), — E-2 -ul. Constructeurs 6 à Lublin (terrain no 1/26 r. 13 haïds)., translated_summary
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 11,554 bytes +218 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 11,363 bytes +185 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 11,178 bytes −235 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 11,413 bytes +1,124 Created claim: summary (P836): The project involves the reconstruction of the 110/6 kV power station power supply system designated E1 and E2 in order to connect a 11.8 MW RES power unit: — E-1 – ul. Ślusarska 5, Lublin (part of land no. 1/86 r. 13 Hajd), – E-2 -ul. Constructors 6 in Lublin (part of land no. 1/26 r. 13 Hajds)., translated_summary
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 10,289 bytes −711 Removed claim: summary (P836): The project consists of the conversion of the electricity station electricity supply system 110/6kV marked E1 and E2. for the purpose of connecting an RES energy unit with a capacity of 11.8 MW:— E-1 — ul.Sulsarska 5, Lublin (land parcel 1/8613 of the Hajdów), — E-2.Constructors 6 in Lublin (land parcel No 1/2613 of the Hajdów)., remove_old_english_translation

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3909:39, 4 March 2020DG Regio talk contribs 9,710 bytes +711 Created claim: summary (P836): The project consists of the conversion of the electricity station electricity supply system 110/6kV marked E1 and E2. for the purpose of connecting an RES energy unit with a capacity of 11.8 MW:— E-1 — ul.Sulsarska 5, Lublin (land parcel 1/8613 of the Hajdów), — E-2.Constructors 6 in Lublin (land parcel No 1/2613 of the Hajdów)., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020