Revision history of "Construction of GPO 20/110 kV together with 110 kV distribution network to connect 28 MW RES generation units in the commune Bogatynia" (Q84417)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 64,298 bytes +15 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 64,283 bytes +5 Set a claim value: summary (P836): O projeto será executado no âmbito do agrupamento de Zgorzelecki para o desenvolvimento de fontes de energia renováveis e a eficiência energética [Klaster Zgorzelecki], voivodia de Dolnośląskie, distrito de zgorzelec, município de Bogatynia. A construção prevista da linha de cabo de 110 kV e a construção de GPO 20/110 kV estão em conformidade com os planos locais de ordenamento do território. A localização do investimento depende da localização dos...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3522:35, 2 March 2023DG Regio talk contribs 61,884 bytes −343 Changed label, description and/or aliases in ro, lv, fr, da, it, es, cs, et, ga, sk, lt, fi, de, sv, hr, bg, hu, sl, pt, nl, el, mt, and other parts

2 December 2022

26 October 2022

19 October 2022

13 August 2022

  • curprev 17:1317:13, 13 August 2022DG Regio talk contribs 60,526 bytes +37,554 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 14,808 bytes +1,942 Created claim: summary (P836): Le projet sera mis en œuvre dans le cadre du pôle Zgorzelecki pour le développement des sources d’énergie renouvelables et de l’efficacité énergétique [Klaster Zgorzelecki], dans la voïvodie de Basse-Silésie, comté de Zgorzelec, municipalité de Bogatynia. La construction prévue de la ligne de câble 110 kV et la construction de la GPO 20/110 kV sont conformes aux plans de zonage locaux. La localisation de l’investissement est déterminée par l’emp...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 12,866 bytes +244 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,649 bytes +194 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,455 bytes −220 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,675 bytes +1,810 Created claim: summary (P836): The project will be implemented as part of the Zgorzelecki Cluster for the Development of Renewable Sources of Energy and Energy Efficiency [Klaster Zgorzelecki], Dolnośląskie Voivodeship, zgorzelec County, Bogatynia commune. The planned construction of the 110 kV cable line and the construction of GPO 20/110 kV is in line with the local spatial planning plans. The location of the investment is conditional on the location of projects in the fiel...
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 10,865 bytes −1,363 Removed claim: summary (P836): The project will be carried out in the framework of the Regional Renewable Energy and Energy Efficiency Cluster, in Dolnośląskie Province, in the district of Zgorzelecki, in the municipality of Bogatynia.The planned construction of the 110 kV cable line and the construction of the GOP 20/110 kV is in line with local land-use planning.The location of the investment is conditional on the location of generation infrastructure projects — photovolt...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3909:39, 4 March 2020DG Regio talk contribs 10,941 bytes +1,363 Created claim: summary (P836): The project will be carried out in the framework of the Regional Renewable Energy and Energy Efficiency Cluster, in Dolnośląskie Province, in the district of Zgorzelecki, in the municipality of Bogatynia.The planned construction of the 110 kV cable line and the construction of the GOP 20/110 kV is in line with local land-use planning.The location of the investment is conditional on the location of generation infrastructure projects — photovoltai...

18 February 2020

8 February 2020

31 January 2020

14 January 2020