Revision history of "Construction of 110/15 kV Skwierzyna II station to enable the development of renewable energy" (Q84414)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 64,102 bytes +4 Changed label, description and/or aliases in pt
  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 64,098 bytes +56 Set a claim value: summary (P836): O objetivo do projeto é aumentar a possibilidade de ligar fontes de produção de eletricidade FER sem reduzir simultaneamente os parâmetros da energia fornecida e minimizar o risco de falhas e interrupções no fornecimento de energia (os obstáculos pertinentes ao desenvolvimento das energias renováveis serão eliminados). Em resultado do projeto, será aumentada a possibilidade de ligar os produtores de eletricidade a partir de FER. Além disso, as condi...

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

2 December 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:4603:46, 26 July 2022DG Regio talk contribs 60,863 bytes +37,533 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 14,829 bytes +2,033 Created claim: summary (P836): L’objectif du projet est d’accroître la possibilité de connecter les sources de production d’électricité SER sans réduire simultanément les paramètres de l’énergie fournie et minimiser les risques de défaillances et d’interruptions de l’approvisionnement énergétique (les obstacles importants au développement des énergies renouvelables seront supprimés). À la suite de la mise en œuvre du projet, la possibilité de raccorder les producteurs d’élect...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 12,796 bytes +174 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,649 bytes +152 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,497 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,646 bytes +1,842 Created claim: summary (P836): The aim of the project is to increase the possibility of connecting sources of RES electricity generation without simultaneously reducing the parameters of the supplied energy and minimising the risk of failures and interruptions in the supply of energy (relevant barriers to the development of renewable energy will be removed). As a result of the project, the possibility of connecting electricity generators from RES will be increased. In additio...
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 10,804 bytes −1,310 Removed claim: summary (P836): The aim of the project is to increase the capacity to connect sources of electricity generation to RES without reducing the parameters of the energy supplied and minimise the risk of failure and power cuts (the significant barriers to the development of renewable energy will be removed).The project will increase the capacity to connect electricity generators from RES.In addition, the power supply conditions for the target audience will be impr...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3909:39, 4 March 2020DG Regio talk contribs 10,825 bytes +1,310 Created claim: summary (P836): The aim of the project is to increase the capacity to connect sources of electricity generation to RES without reducing the parameters of the energy supplied and minimise the risk of failure and power cuts (the significant barriers to the development of renewable energy will be removed).The project will increase the capacity to connect electricity generators from RES.In addition, the power supply conditions for the target audience will be improv...

18 February 2020

8 February 2020

31 January 2020

14 January 2020