Revision history of "Conversion of 110/15 kV Nidzica station to enable the development of renewable energy" (Q84413)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 85,114 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 85,115 bytes −54 Set a claim value: summary (P836): O âmbito do projecto inclui a reconstrução da central eléctrica GPZ 110/15 kV Nidzica para permitir o desenvolvimento de energias renováveis. A estação faz parte de uma rede de distribuição a uma tensão de 110 kV, onde a eletricidade é transformada a uma tensão de 15 kV. A estação de Nidzica está localizada na Allied Avenue 59 na parcela no 1, perímetro 3, unidade de registro de Nidzica. O terreno está em uso perpétuo da ENERGA-OPERATOR S.A. A área...

12 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3522:35, 2 March 2023DG Regio talk contribs 82,775 bytes +1,605 Changed label, description and/or aliases in lv, it, da, bg, sk, pt, et, lt, ga, hr, ro, de, sv, fr, cs, es, hu, sl, mt, nl, el, fi, and other parts

2 December 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:4603:46, 26 July 2022DG Regio talk contribs 79,467 bytes +50,924 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 17,170 bytes +2,857 Created claim: summary (P836): Le projet comprend la reconstruction de la centrale GPZ 110/15 kV Nidzica afin de permettre le développement des énergies renouvelables. La station fait partie d’un réseau de distribution de 110 kV sur lequel l’électricité est transformée en une tension de 15 kV. La gare de Nidzica est située à l’avenue 59 sur le terrain 1, division 3, unité cadastrale de Nidzica. Le terrain est en usage perpétuel d’ENERGA-OPERATOR S. A. La superficie de la prop...
  • curprev 16:3416:34, 30 November 2021DG Regio talk contribs 14,313 bytes +170 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 14,170 bytes +144 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 14,026 bytes −158 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 14,184 bytes +2,537 Created claim: summary (P836): The scope of the project includes the reconstruction of the power station GPZ 110/15 kV Nidzica to enable the development of renewable energy. The station is part of a distribution network at a voltage of 110 kV, where electricity is transformed to a voltage of 15 kV. Nidzica station is located on Allied Avenue 59 on plot no. 1, perimeter 3, Nidzica registration unit. The land is in perpetual use of ENERGA-OPERATOR S.A. The area of the property...
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 11,647 bytes −2,041 Removed claim: summary (P836): The scope of the project involves the reconstruction of the electricity station GPZ 110/15 kV Niedzica in order to enable the development of renewable energy.The station is part of the 110 kV distribution network where the 15 kV electricity transition is performed.The Niedzica station is located with an Aland allied 59 on plot No 1, area 3, Niedzica registry unit.The land is located in the pure ENERGA-OPERATOR S. A. Surface of the property on...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3909:39, 4 March 2020DG Regio talk contribs 12,399 bytes +2,041 Created claim: summary (P836): The scope of the project involves the reconstruction of the electricity station GPZ 110/15 kV Niedzica in order to enable the development of renewable energy.The station is part of the 110 kV distribution network where the 15 kV electricity transition is performed.The Niedzica station is located with an Aland allied 59 on plot No 1, area 3, Niedzica registry unit.The land is located in the pure ENERGA-OPERATOR S. A. Surface of the property on wh...

18 February 2020

8 February 2020

31 January 2020

14 January 2020