Revision history of "Modernisation of the Municipal Heat Plant in Zambrow for the use of biomass" (Q84407)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 57,977 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:4215:42, 13 October 2024DG Regio talk contribs 57,978 bytes −35 Set a claim value: summary (P836): O projeto diz respeito à ampliação da instalação de combustão existente por uma fonte de calor — uma caldeira de água alimentada a biomassa. O projeto deve incluir a execução de: • caldeira de água de biomassa florestal de 8 MW com instalações colaborativas; • modernização das instalações de aquecimento e dos sistemas de controlo; • o sistema de abastecimento de combustível com magnésio e equipamento; • chaminé; • ligação da fonte à rede de transpor...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

2 December 2022

26 October 2022

19 October 2022

26 July 2022

  • curprev 03:4603:46, 26 July 2022DG Regio talk contribs 53,426 bytes +32,390 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2616:26, 30 November 2021DG Regio talk contribs 13,958 bytes +1,710 Created claim: summary (P836): Le projet concerne l’extension d’une installation de combustion existante dotée d’une seule source de chaleur — une chaudière à eau alimentée à la biomasse. Le projet implique la mise en œuvre de: • Chaudière à eau à biomasse forestière de 8 MW avec installations et équipements coopérants; • modernisation des systèmes de chauffage et de contrôle; • système d’alimentation en carburant avec magnésium et équipement; • cheminée; • raccordement de la...
  • curprev 16:2616:26, 30 November 2021DG Regio talk contribs 12,248 bytes +157 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,118 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 11,984 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 12,119 bytes +1,571 Created claim: summary (P836): The project concerns the extension of the existing combustion plant by one heat source – a biomass-fired water boiler. The project shall include the implementation of: • 8 MW forest biomass water boiler with collaborative installations; • modernisation of heating installations and control systems; • the fuel supply system with magnesium and equipment; • chimney; • connection of the source to the transmission network, i.e. urban district heating...
  • curprev 13:0113:01, 14 October 2020DG Regio talk contribs 10,548 bytes −1,168 Removed claim: summary (P836): The project concerns the extension of an existing combustion plant with one heat generator, a biomass boiler.The project shall consist of the execution of:• an aquatic biomass boiler with a capacity of 8 MW with installations, cooperating devices;• the upgrading of district heating installations and control systems;• System of fuel delivery with magnesium and equipment;• stack;• the connection of the source to the transmission network, i.e. th...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3809:38, 4 March 2020DG Regio talk contribs 10,425 bytes +1,168 Created claim: summary (P836): The project concerns the extension of an existing combustion plant with one heat generator, a biomass boiler.The project shall consist of the execution of:• an aquatic biomass boiler with a capacity of 8 MW with installations, cooperating devices;• the upgrading of district heating installations and control systems;• System of fuel delivery with magnesium and equipment;• stack;• the connection of the source to the transmission network, i.e. the...

18 February 2020

8 February 2020

31 January 2020

14 January 2020