Revision history of "A new generation system for high-performance wall complexes" (Q84081)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:3915:39, 13 October 2024DG Regio talk contribs 93,326 bytes −14 Changed label, description and/or aliases in pt
  • curprev 15:3915:39, 13 October 2024DG Regio talk contribs 93,340 bytes −41 Set a claim value: summary (P836): O objetivo do projeto é desenvolver e implementar uma nova geração de sistema de alimentação de mineração para colheitadeira de parede de alto desempenho. Desenvolvido há 40 anos, o sistema de alimentação Eicotrack de uso comum não está adaptado ao poder das modernas colheitadeiras de parede. O resultado do desenvolvimento das ceifeiras-debulhadoras é, entre outras coisas, um aumento da resistência do trator, o que, em conjunto com a construção rígi...

23 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

25 October 2022

20 October 2022

26 July 2022

  • curprev 03:3503:35, 26 July 2022DG Regio talk contribs 81,705 bytes +53,226 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:2516:25, 30 November 2021DG Regio talk contribs 16,876 bytes +2,941 Created claim: summary (P836): L’objectif du projet est de développer et de mettre en œuvre une nouvelle génération de système d’alimentation minière d’une moissonneuse murale haute performance. Développé il y a quarante ans, le système d’alimentation Eicotrack couramment utilisé n’est pas adapté à la puissance des combinaisons murales modernes. Le résultat du développement des combinaisons murales est, entre autres, une augmentation de leur force de traction, ce qui, en conj...
  • curprev 16:2516:25, 30 November 2021DG Regio talk contribs 13,935 bytes +151 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:5116:51, 14 October 2020DG Regio talk contribs 14,224 bytes +2,608 Created claim: summary (P836): The aim of the project is to develop and implement a new generation of mining feed system for high-performance wall harvester. Developed forty years ago, the commonly used Eicotrack feed system is not adapted to the power of modern wall harvesters. The result of the development of wall harvesters is, among other things, an increase in their tractor strength, which, in conjunction with the rigid construction of the Eicotrack system, increases the...
  • curprev 16:5116:51, 14 October 2020DG Regio talk contribs 11,616 bytes −2,194 Removed claim: summary (P836): The aim of the project is to develop and implement a new generation system for a high-performance multipurpose mine.40 years ago, the commonly used Eick-off ground scheme is not adapted to the strength of modern walls of the wall.As a result of the development of the combine harvester, the wall features, inter alia, of the increase of their forces, which, in conjunction with the rigid construction of the Eickaside system, increases the consump...
  • curprev 14:2914:29, 14 October 2020DG Regio talk contribs 13,810 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:2914:29, 14 October 2020DG Regio talk contribs 13,692 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label

25 September 2020

23 September 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5709:57, 4 March 2020DG Regio talk contribs 12,516 bytes +2,194 Created claim: summary (P836): The aim of the project is to develop and implement a new generation system for a high-performance multipurpose mine.40 years ago, the commonly used Eick-off ground scheme is not adapted to the strength of modern walls of the wall.As a result of the development of the combine harvester, the wall features, inter alia, of the increase of their forces, which, in conjunction with the rigid construction of the Eickaside system, increases the consumpti...

18 February 2020

8 February 2020

31 January 2020

14 January 2020