Revision history of "Increasing competitiveness through the implementation of 6 new design projects by Modular DC Solutions Sp. z o. o. Sp. k." (Q81935)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:5121:51, 12 October 2024DG Regio talk contribs 82,530 bytes −1 Changed label, description and/or aliases in pt
  • curprev 21:5121:51, 12 October 2024DG Regio talk contribs 82,531 bytes −10 Set a claim value: summary (P836): SA 42799 (2015/X) A execução do projeto prevê a execução de 6 novos projetos de conceção sob a forma de 4 modelos de peso e 2 sistemas de comutação automática de energia para a oferta de produtos do requerente, com base na cooperação com projetistas profissionais. O projeto irá conceber novas propriedades técnicas, visuais e funcionais dos novos produtos acima apresentados. O escopo do processo de projeto prevê, entre outros, determinar a capacidade...

23 March 2024

12 January 2024

11 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 00:5300:53, 26 July 2022DG Regio talk contribs 76,354 bytes +48,915 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 15:2115:21, 30 November 2021DG Regio talk contribs 16,411 bytes +2,743 Created claim: summary (P836): SA 42799(2015/X) La mise en œuvre du projet prévoit la mise en œuvre de 6 nouveaux projets de conception sous la forme de 4 modèles de charge et de 2 systèmes de commutation automatique de puissance à l’offre de produits de la requérante, sur la base d’une coopération avec des concepteurs professionnels. Dans le cadre de la mise en œuvre du projet, de nouvelles caractéristiques techniques, visuelles et fonctionnelles des nouveaux produits susmen...
  • curprev 15:2115:21, 30 November 2021DG Regio talk contribs 13,668 bytes +187 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 11:2011:20, 14 October 2020DG Regio talk contribs 13,921 bytes +181 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:2011:20, 14 October 2020DG Regio talk contribs 13,740 bytes −174 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:2011:20, 14 October 2020DG Regio talk contribs 13,914 bytes +2,350 Created claim: summary (P836): SA 42799(2015/X) Project implementation envisages implementation of 6 new design projects in the form of 4 weight models and 2 automatic power switching systems to the Applicant’s product offer based on cooperation with professional designers. The project will design new technical, visual and functional properties of the new products presented above. The scope of the design process provides, among others, for determining optimal load capacity, d...
  • curprev 11:2011:20, 14 October 2020DG Regio talk contribs 11,564 bytes −1,978 Removed claim: summary (P836): SA 42799 (2015/X) Implementation of the project provides for the implementation of 6 new design projects in the form of 4 models of load models and 2 automatic systems switching the applicant’s output to the applicant based on cooperation with professional designers.As part of the implementation of the project, new technical, visual and performance features will be developed above the new products presented.The scope of the project process pro...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:1709:17, 4 March 2020DG Regio talk contribs 12,251 bytes +1,978 Created claim: summary (P836): SA 42799 (2015/X) Implementation of the project provides for the implementation of 6 new design projects in the form of 4 models of load models and 2 automatic systems switching the applicant’s output to the applicant based on cooperation with professional designers.As part of the implementation of the project, new technical, visual and performance features will be developed above the new products presented.The scope of the project process provi...

18 February 2020

8 February 2020

31 January 2020

14 January 2020