Revision history of "Innovative system for automated monitoring of critical infrastructure in electricity lines" (Q80222)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:0106:01, 13 October 2024DG Regio talk contribs 88,767 bytes −13 Changed label, description and/or aliases in pt
  • curprev 06:0106:01, 13 October 2024DG Regio talk contribs 88,780 bytes −24 Set a claim value: summary (P836): O projeto consiste na criação de um sistema de acompanhamento dos trabalhos de modernização das infraestruturas críticas existentes no domínio das redes elétricas. Os relatórios serão baseados em dados recolhidos a partir de ataques de drones. A exatidão dos dados recolhidos será aceitável a um nível de aproximadamente 1 centímetro para componentes de maiores dimensões, tais como fundações, fios, ganchos. A mera potência dos dados por drones será re...

23 March 2024

12 January 2024

11 June 2023

24 May 2023

2 March 2023

25 October 2022

20 October 2022

25 July 2022

  • curprev 22:3722:37, 25 July 2022DG Regio talk contribs 83,012 bytes +53,371 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 14:3314:33, 30 November 2021DG Regio talk contribs 17,818 bytes +2,884 Created claim: summary (P836): Le projet consiste à mettre en place un système de suivi des travaux de modernisation des infrastructures critiques existantes dans le domaine des réseaux électriques. Les rapports seront fondés sur les données recueillies lors des raids de drones. L’exactitude des données collectées sera acceptable au niveau d’environ. 1 centimètre pour les composants plus grands tels que fondations, fils, crochets. Le flux de données par les drones lui-même se...
  • curprev 14:3314:33, 30 November 2021DG Regio talk contribs 14,934 bytes +176 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 11:4411:44, 14 October 2020DG Regio talk contribs 15,198 bytes +149 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4411:44, 14 October 2020DG Regio talk contribs 15,049 bytes −131 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4411:44, 14 October 2020DG Regio talk contribs 15,180 bytes +2,600 Created claim: summary (P836): The project consists of creating a system to monitor modernisation work on the existing critical infrastructure in the field of electricity grids. Reporting will be based on data collected from drone raids. The accuracy of the collected data will be acceptable at a level of approx. 1 centimetres for larger components such as foundations, wires, hooks. The mere power of the data by drones will be performed using photogrammetry and/or using a lase...
  • curprev 11:4411:44, 14 October 2020DG Regio talk contribs 12,580 bytes −2,074 Removed claim: summary (P836): The project consists of setting up a system to monitor the modernisation works on the existing critical electricity network infrastructure.The reporting will be based on the data collected from the drone strikes.The accuracy of the data collected will be acceptable at around1 centimetres for major components such as foundations, cables, hooks.The mere access to the data by drones will be carried out by means of photogrammetry and/or by using a...

25 September 2020

23 September 2020

15 July 2020

9 June 2020

6 June 2020

26 March 2020

4 March 2020

  • curprev 09:0209:02, 4 March 2020DG Regio talk contribs 12,942 bytes +2,074 Created claim: summary (P836): The project consists of setting up a system to monitor the modernisation works on the existing critical electricity network infrastructure.The reporting will be based on the data collected from the drone strikes.The accuracy of the data collected will be acceptable at around1 centimetres for major components such as foundations, cables, hooks.The mere access to the data by drones will be carried out by means of photogrammetry and/or by using a l...

18 February 2020

8 February 2020

31 January 2020

14 January 2020