Revision history of "Integrated Supply Supply System for the operation of the distribution network" (Q80185)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

25 July 2022

  • curprev 22:3422:34, 25 July 2022DG Regio talk contribs 84,755 bytes +54,272 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 14:3214:32, 30 November 2021DG Regio talk contribs 18,132 bytes +3,046 Created claim: summary (P836): L’objet du projet est le développement d’un ensemble modulaire d’équipements qui permettra de réduire les interruptions d’approvisionnement en électricité des clients finals. La solution proposée — le système d’alimentation électrique ininterrompu pour les clients (SBZO), permettra de maximiser la continuité de l’approvisionnement en électricité, tant lors des travaux de rénovation prévus liés à la modernisation de l’infrastructure du réseau de...
  • curprev 14:3214:32, 30 November 2021DG Regio talk contribs 15,086 bytes +181 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 11:4311:43, 14 October 2020DG Regio talk contribs 15,345 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4311:43, 14 October 2020DG Regio talk contribs 15,209 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4311:43, 14 October 2020DG Regio talk contribs 15,377 bytes +2,650 Created claim: summary (P836): The subject of the project is the development of a modular set of devices, which will allow to limit interruptions in electricity supply to final customers. The proposed solution – The system of uninterrupted supply of customers (SBZO), will allow to maximise the continuity of electricity supply both during planned renovation works related to the modernisation of the distribution network infrastructure, as well as during failure recovery work. T...
  • curprev 11:4311:43, 14 October 2020DG Regio talk contribs 12,727 bytes −2,178 Removed claim: summary (P836): The aim of the project is to develop a modular set of devices to reduce the electricity supply to final customers.The proposed solution (SBZO) will maximise the continuity of electricity supply both during the planned renovation works related to the upgrading of the infrastructure of the distribution network, as well as during the work related to the removal of the accident.The main elements of the agreement are as follows:separate SN/NN trans...

23 September 2020

15 July 2020

9 June 2020

6 June 2020

26 March 2020

4 March 2020

  • curprev 09:0209:02, 4 March 2020DG Regio talk contribs 13,185 bytes +2,178 Created claim: summary (P836): The aim of the project is to develop a modular set of devices to reduce the electricity supply to final customers.The proposed solution (SBZO) will maximise the continuity of electricity supply both during the planned renovation works related to the upgrading of the infrastructure of the distribution network, as well as during the work related to the removal of the accident.The main elements of the agreement are as follows:separate SN/NN transfo...

18 February 2020

8 February 2020

31 January 2020

14 January 2020