Revision history of "Smart-OES – a system supporting work management and planning of the development of power grids saturated with production and reception resources." (Q78505)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:5305:53, 13 October 2024DG Regio talk contribs 77,897 bytes −6 Changed label, description and/or aliases in pt
  • curprev 05:5305:53, 13 October 2024DG Regio talk contribs 77,903 bytes +6 Set a claim value: summary (P836): O projeto tem por objeto o desenvolvimento de um sistema informático Smart-OES concebido para apoiar o planeamento do desenvolvimento e da gestão das redes elétricas (clássicas e inteligentes) e dos recursos de fabrico e receção ligados a essas redes. O sistema terá em conta as interdependências técnicas e de mercado nas redes com um elevado grau de saturação com as unidades de produção locais, o armazenamento de energia, as infraestruturas de eletr...

20 March 2024

12 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 22:2222:22, 2 March 2023DG Regio talk contribs 75,142 bytes −150 Changed label, description and/or aliases in sk, it, da, lv, ga, fr, el, lt, fi, et, nl, bg, ro, pt, cs, sv, hr, es, sl, hu, de, mt, and other parts

20 October 2022

25 July 2022

  • curprev 20:4620:46, 25 July 2022DG Regio talk contribs 74,482 bytes +47,155 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:1516:15, 30 November 2021DG Regio talk contribs 16,855 bytes +2,515 Created claim: summary (P836): L’objet du projet est le développement du système informatique Smart-OES destiné à soutenir la planification du développement et de la gestion des réseaux électriques (classiques et intelligents) ainsi que la production et la réception des ressources connectées à ces réseaux. Le système tiendra compte des interdépendances techniques et commerciales constatées dans les réseaux présentant un degré élevé de saturation des unités de production local...
  • curprev 16:1516:15, 30 November 2021DG Regio talk contribs 14,340 bytes +236 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 12:5112:51, 14 October 2020DG Regio talk contribs 14,544 bytes +207 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5112:51, 14 October 2020DG Regio talk contribs 14,337 bytes −202 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5112:51, 14 October 2020DG Regio talk contribs 14,539 bytes +2,266 Created claim: summary (P836): The subject of the project is the development of an IT system Smart-OES designed to support the planning of the development and management of electricity networks (classic and intelligent) and the manufacturing and reception resources connected to these networks. The system will take into account technical and market interdependencies in networks with a high degree of saturation with local production units, energy storage, infrastructure for ele...
  • curprev 12:5112:51, 14 October 2020DG Regio talk contribs 12,273 bytes −1,730 Removed claim: summary (P836): The project is the development of an IT system SmartT-OS to support the development and management of electricity networks (classical and intelligent) and reception facilities (ToR) connected to these networks.The scheme will take into account technical and market interdependencies in high-saturation networks, local generation units, energy storage facilities, the infrastructure for electro-mobility, active blowers, etc., taking into account t...

17 July 2020

9 June 2020

6 June 2020

26 March 2020

4 March 2020

  • curprev 09:2209:22, 4 March 2020DG Regio talk contribs 12,281 bytes +1,730 Created claim: summary (P836): The project is the development of an IT system SmartT-OS to support the development and management of electricity networks (classical and intelligent) and reception facilities (ToR) connected to these networks.The scheme will take into account technical and market interdependencies in high-saturation networks, local generation units, energy storage facilities, the infrastructure for electro-mobility, active blowers, etc., taking into account the...

18 February 2020

8 February 2020

31 January 2020

13 January 2020