Revision history of "BD Bechyně Na Libushi 649" (Q76944)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4705:47, 13 October 2024DG Regio talk contribs 50,642 bytes −3 Set a claim value: summary (P836): O projeto é um edifício de apartamentos em tijolo com o riacho n.o 649, 650, 651,652,653 na rua Na Libuši, em Bechyně, distrito de Tábor, e a sua regeneração para medidas conducentes a poupanças de aquecimento na entrada. O projeto trata principalmente do isolamento da envolvente do edifício e das alterações conexas aos elementos da envolvente. Está pronto para a redução de energia de acordo com os requisitos do IROP. O objetivo do projeto é reduzir...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 18:3118:31, 25 July 2022DG Regio talk contribs 46,950 bytes +27,474 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5601:56, 29 November 2021DG Regio talk contribs 13,374 bytes +1,457 Created claim: summary (P836): Le projet est un immeuble d’appartements en brique avec la ferme no 649, 650, 651,652653 dans la rue Na Libuši à Bechynia, district de Tábor et sa régénération pour des mesures permettant d’économiser le chauffage à l’entrée. Le projet porte principalement sur l’isolation de l’enveloppe du bâtiment et les modifications connexes apportées aux éléments de l’enveloppe. Il est prêt pour la réduction d’énergie selon les exigences IROP. L’objectif du...
  • curprev 01:5601:56, 29 November 2021DG Regio talk contribs 11,917 bytes +85 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:3322:33, 23 October 2020DG Regio talk contribs 12,281 bytes +85 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:3322:33, 23 October 2020DG Regio talk contribs 12,196 bytes −83 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:3322:33, 23 October 2020DG Regio talk contribs 12,279 bytes +1,370 Created claim: summary (P836): The project is a brick apartment building with creek no. 649, 650, 651,652,653 in Na Libuši street in Bechyně, Tábor district and its regeneration for measures leading to savings of heating at the entrance. The project mainly deals with insulation of the building envelope and related changes to the elements of the envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce heating costs for...
  • curprev 22:3322:33, 23 October 2020DG Regio talk contribs 10,909 bytes −911 Removed claim: summary (P836): The project is a residential house with equator no. 649, 650, 651,652,653 in the street On Libuše v Bechyni, Tábor district and its regeneration for heating saving measures. The project addresses in particular the insulation of the envelope of the building and the related modifications of the envelope. It is ready to reduce energy in line with the IROP requirements. The aim of the project is to reduce the cost of heating the population of a bu...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:2606:26, 27 February 2020DG Regio talk contribs 10,020 bytes +911 Created claim: summary (P836): The project is a residential house with equator no. 649, 650, 651,652,653 in the street On Libuše v Bechyni, Tábor district and its regeneration for heating saving measures. The project addresses in particular the insulation of the envelope of the building and the related modifications of the envelope. It is ready to reduce energy in line with the IROP requirements. The aim of the project is to reduce the cost of heating the population of a buil...

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020