Revision history of "Insulation, roof reconstruction and replacement of apartment building no. 473 and 474" (Q76856)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1715:17, 13 October 2024DG Regio talk contribs 53,285 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:1715:17, 13 October 2024DG Regio talk contribs 53,283 bytes +14 Set a claim value: summary (P836): O edifício foi concebido dentro de um edifício de apartamentos existente. É um projecto de um novo isolamento externo das paredes do perímetro da casa, isolamento do porão, isolamento do tecto 1. PP, reconstrução da cobertura do telhado e substituição de janelas e portas. A construção inclui um novo acabamento do tratamento de superfície utilizando um sistema de isolamento térmico da fachada com poliestireno e uma camada fina de gesso colorido. As c...

23 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 18:2518:25, 25 July 2022DG Regio talk contribs 49,051 bytes +29,144 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5601:56, 29 November 2021DG Regio talk contribs 13,663 bytes +1,463 Created claim: summary (P836): La construction est conçue à l’intérieur de l’immeuble d’appartements existant. Il s’agit de la mise en œuvre de nouvelle isolation externe des murs du périmètre de la maison, isolation du sous-sol, isolant le plafond 1. Pp, couverture de toiture reconstruction et remplacement des fenêtres et des portes. La construction comprend une nouvelle finition utilisant un système d’isolation de façade avec polystyrène et couche mince de plâtre peint. La...
  • curprev 01:5601:56, 29 November 2021DG Regio talk contribs 12,200 bytes +167 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:3122:31, 23 October 2020DG Regio talk contribs 12,482 bytes +144 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:3122:31, 23 October 2020DG Regio talk contribs 12,338 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:3122:31, 23 October 2020DG Regio talk contribs 12,485 bytes +1,411 Created claim: summary (P836): The building is designed within an existing apartment building. It is a design of a new external insulation of the perimeter walls of the house, insulation of the basement, insulation of the ceiling 1. PP, reconstruction of roof cover and replacement of windows and doors. The construction includes a new finish of the surface treatment using a facade thermal insulation system with polystyrene and a thin layer coloured plaster. The existing chimne...
  • curprev 22:3122:31, 23 October 2020DG Regio talk contribs 11,074 bytes −935 Removed claim: summary (P836): The construction works are designed in the context of an existing apartment building. This is a new external insulation for the wall walls of the house, insulation of the basement, insulation of the ceiling of 1. PP, the renovation of roof coats and the exchange of windows and doors. The construction includes a new coating, using the facade system, with a polystyrene and a thinner side cavity. The construction works will remove the existing ch...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3206:32, 27 February 2020DG Regio talk contribs 10,230 bytes +935 Created claim: summary (P836): The construction works are designed in the context of an existing apartment building. This is a new external insulation for the wall walls of the house, insulation of the basement, insulation of the ceiling of 1. PP, the renovation of roof coats and the exchange of windows and doors. The construction includes a new coating, using the facade system, with a polystyrene and a thinner side cavity. The construction works will remove the existing chim...

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020