Revision history of "Revitalisation of the apartment building in Alfonse Muchy street 418/18 and 418/20, Litoměřice" (Q76754)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4705:47, 13 October 2024DG Regio talk contribs 45,833 bytes −21 Set a claim value: summary (P836): O objetivo do projeto é isolar a fachada, reconstruir as loggias, isolar o telhado, substituir os elementos de abertura inalterados remanescentes, substituir os elementos finais do ar condicionado e reconstruir os espaços comuns internos, ou seja, entrada, escada e corredores.

23 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 18:1818:18, 25 July 2022DG Regio talk contribs 41,636 bytes +23,619 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5801:58, 29 November 2021DG Regio talk contribs 12,845 bytes +1,175 Created claim: summary (P836): L’objet du projet est l’isolation de la façade, la reconstruction des loggias, l’isolation du toit, le remplacement des éléments d’ouverture non remplacés restants, le remplacement des éléments d’extrémité de la climatisation et la reconstruction des espaces communs internes, c’est-à-dire les entrées, les escaliers et les couloirs., translated_summary
  • curprev 01:5801:58, 29 November 2021DG Regio talk contribs 11,670 bytes +166 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 11,953 bytes +155 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 11,798 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 11,940 bytes +1,103 Created claim: summary (P836): The object of the project is to insulate the facade, reconstruction of loggias, roof insulation, replacement of remaining unchanged opening elements, replacement of end elements of air conditioning and reconstruction of internal common spaces, i.e. entrance, staircase and corridors., translated_summary
  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 10,837 bytes −663 Removed claim: summary (P836): The project involves the insulation of facades, reconstruction of the roof, the insulation of the roof, the replacement of the remaining void elements, the exchange of the end elements of the air, and the reconstruction of the internal common areas, i.e. entrances, staircases and corridors., remove_old_english_translation

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1406:14, 27 February 2020DG Regio talk contribs 9,721 bytes +663 Created claim: summary (P836): The project involves the insulation of facades, reconstruction of the roof, the insulation of the roof, the replacement of the remaining void elements, the exchange of the end elements of the air, and the reconstruction of the internal common areas, i.e. entrances, staircases and corridors., Adding English summary

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020