Revision history of "Revitalisation of the apartment house Hornická 1008" (Q76749)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 18:1818:18, 25 July 2022DG Regio talk contribs 45,544 bytes +25,693 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5701:57, 29 November 2021DG Regio talk contribs 14,213 bytes +1,380 Created claim: summary (P836): Le projet a pour objet la mise en œuvre de l’isolation du périmètre et des revêtements de toiture, y compris les nouveaux revêtements, le remplacement des balcons et des garde-corps aux fenêtres françaises, la construction de toitures au-dessus des balcons et des entrées et les travaux d’entretien connexes. Et aussi la documentation du projet, la sécurité de la construction (TDI, AD, SST) la réglementation du système de chauffage, le traitement...
  • curprev 01:5701:57, 29 November 2021DG Regio talk contribs 12,833 bytes +113 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 13,169 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 13,058 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 13,179 bytes +1,245 Created claim: summary (P836): The object of the project is the realisation of insulation of the perimeter and roof covering including new covering, replacement of balconies and railings by French windows, roofing above balconies and entrance and related maintenance work. Further, Project Documentation, Construction Security (TDI, AD, OSH) Regulating the heating system, EH processing, bases for evaluation, tender for the contractor of the construction., translated_summary
  • curprev 23:0423:04, 23 October 2020DG Regio talk contribs 11,934 bytes −828 Removed claim: summary (P836): The project concerns the insulation of the building envelope and roof envelope, including the new coverings, the replacement of balconies and railings in French windows, the execution of a crumb over the balconies and the entrance and associated maintenance work. As well as the Project Documentation, Building Building (TDI, AD, OSH), regulating the heating system, EH processing, evaluation documents, selection procedure for the construction co...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1406:14, 27 February 2020DG Regio talk contribs 10,961 bytes +828 Created claim: summary (P836): The project concerns the insulation of the building envelope and roof envelope, including the new coverings, the replacement of balconies and railings in French windows, the execution of a crumb over the balconies and the entrance and associated maintenance work. As well as the Project Documentation, Building Building (TDI, AD, OSH), regulating the heating system, EH processing, evaluation documents, selection procedure for the construction cont...

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020