Revision history of "Revitalisation of the apartment building Vyšší Brod 310" (Q76716)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4705:47, 13 October 2024DG Regio talk contribs 51,035 bytes +2 Changed label, description and/or aliases in pt
  • curprev 05:4705:47, 13 October 2024DG Regio talk contribs 51,033 bytes +21 Set a claim value: summary (P836): O projeto tem por objeto a implementação do sistema de isolamento exterior de contacto do revestimento circundante do edifício (fachada), o nivelamento de algumas superfícies MIV, a entrega de novas grades em rolamentos, a reconstrução de pavimentos de loggias, o isolamento térmico do rés-do-chão com lã a granel, a substituição do revestimento do telhado e os trabalhos de manutenção conexos. Além disso, documentação do projeto, segurança da construç...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 18:1518:15, 25 July 2022DG Regio talk contribs 48,340 bytes +27,821 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5701:57, 29 November 2021DG Regio talk contribs 14,560 bytes +1,462 Created claim: summary (P836): L’objet du projet est la réalisation d’un système d’isolation extérieure de contact de l’enveloppe du bâtiment à venir (fasade), la compensation de certaines zones MIV, la livraison de nouvelles garde-corps sur loggias, la reconstruction des sols loggia, l’isolation du plancher avec de la laine lâche, le remplacement du matériau de toiture et les travaux d’entretien connexes. Ainsi que la documentation du projet, la sécurité de la construction (...
  • curprev 01:5701:57, 29 November 2021DG Regio talk contribs 13,098 bytes +107 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 23:0323:03, 23 October 2020DG Regio talk contribs 13,440 bytes +117 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 23:0323:03, 23 October 2020DG Regio talk contribs 13,323 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 23:0323:03, 23 October 2020DG Regio talk contribs 13,439 bytes +1,368 Created claim: summary (P836): The object of the project is the implementation of the contact outdoor insulated system of the building’s surrounding shell (fasade), levelling of some surfaces MIV, delivery of new railings on bearings, reconstruction of floors of loggias, thermal insulation of the ground floor with bulk wool, replacement of roof covering and related maintenance work. Further, Project Documentation, Construction Security (TDI, AD, OSH)Provision of heating syste...
  • curprev 23:0323:03, 23 October 2020DG Regio talk contribs 12,071 bytes −932 Removed claim: summary (P836): The subject of the project is the implementation of the external heating system on the existing building envelope (facade) of the building, the compensation of certain areas of the MIV, the supply of new railings on the shelves, renovation of floors by boat, insulation of the floor of the soil in bulk, the replacement of roof coverings and related maintenance work. As well as the Project Documentation, Building Building (TDI, AD, OSH), regulat...

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1406:14, 27 February 2020DG Regio talk contribs 11,202 bytes +932 Created claim: summary (P836): The subject of the project is the implementation of the external heating system on the existing building envelope (facade) of the building, the compensation of certain areas of the MIV, the supply of new railings on the shelves, renovation of floors by boat, insulation of the floor of the soil in bulk, the replacement of roof coverings and related maintenance work. As well as the Project Documentation, Building Building (TDI, AD, OSH), regulatin...

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020